ML18005A416

From kanterella
Jump to navigation Jump to search
Forwards Failure Analysis Associates Rept PA-R-88-03-15, Metallurgical Evaluation of EDG Bases from Cp&L,Shearon Harris Nuclear Station. Evaluation Shows That Microstruture of Both Engine Bases Is Acceptable
Date released: 08/31/2018 Download: ML18005A416


Metallurigical Evaluation of EDG Bases from Cp&L,Shearon Harris Nuclear Station.
ML18005A418
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1988
From: Wachob H
FAILURE ANALYSIS ASSOCIATES, INC.
To:
References
Download: ML18005A418 (9)
Forwards Failure Analysis Associates Rept PA-R-88-03-15, Metallurgical Evaluation of EDG Bases from Cp&L,Shearon Harris Nuclear Station. Evaluation Shows That Microstruture of Both Engine Bases Is Acceptable
ML18005A415
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/10/1988
From: Loflin L
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
Download: ML18005A415 (3)