Application for Amend to License NPF-63,revising Operability Requirements of Tech Spec 3.3.3.7 Re Chlorine Detection Sys. Fee Paid
ML18005A411
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/10/1988
From: Eury L
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18005A412 List:
References
NLS-88-106, NUDOCS 8805130224
Download: ML18005A411 (11)


Text

i

'ACCELERATED DISOJBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:8805130224 DOC.DATE: 88/05/10 NOTARIZED: YES FACXL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION EURY,L.W.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g 05000400

SUBJECT:

Application for amend to License NPF-63,revising operability requirements of Tech Spec 3.3.3.7 re chlorine detection sys.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR g ENCL g SIZE: Z+f TXTLE: OR Submittal:

General Distribution NOTES:Application for permit renewal filed.

05000400D RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B XNTERNAL: ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC 15-B-18 RES/DE/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

0 1

1' 6

1 1

1 1

1 1

1 1

1 0

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD2-1 PD ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11

~}gg BSTRACT GFIL 01 NRC PDR COPIES LTTR ENCL 5

5 1

0 1

1 1

1 1

1 1

1 1

1 1

1 A

~

(

D

'I]

S

'A TOTAL NUMBER OF COPIES REQUIRED:

LTTR 28 ENCL 25

'LYNNW. EURY Senior Vice President Operattons Support CettLL Carolina Power 8 Ught Company P. O. Box t55t

~ Ratettth, N. C. 27802 MAY 10 N8 e

SERIAL: NLS-88-106 10CFR50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.

50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHLORINE DETECTION SYSTEM Gentlemen:

In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power

& Light Company (CP6L) hereby requests a revision to the Technical Specifications for the Shearon Harris Nuclear Power Plant (SHNPP).

The proposed amendment revises the operability requirements of Technical Specification 3.3.3.7, Chlorine Detection Systems.

The current specification requires that two independent chlorine detector trains be operable in all Modes with each train consisting of a detector at each Control Room Area Ventilation System intake (both normal and emergency) and a detector at the chlorine storage area.

The proposed change will require the detectors at the chlorine storage area to be operable only when there is liquified chlorine in amounts in excess of 20 pounds stored at the chlorine storage area.

The operability requirements for the chlorine detectors located in the control room intakes are not affected by the proposed amendment.

Enclosure 1 provides a detailed description of the proposed change and the basis for the change.

Enclosure 2 details the basis for the Company's determination that the proposed change does not involve a significant hazards consideration.

Enclosure 3 provides the proposed Technical Specification page.

In accordance with the requirements of 10CFR170.12, a check for $ 150 is also enclosed.

S ujt (l5 4

8805130224 880510 PDR ADOCK 05000400 P

DCD

l C-

'I f

,rp~

I f

Document Control Des

'LS-88-106 / Page 2

Please refer any questions regarding this submittal to Mr. Mark A.

Turkal at (919) 362-2985.

Yours very truly, L.

W. Eury LWE/MAT

Enclosures:

1.

Basis for Change Request 2.

10CFR50.92 Evaluation 3.

Technical Specification Page cc:

Mr. Dayne H. Brown Mr. B.

C. Buckley Dr. J. Nelson Grace Mr. G. F. Maxwell L.

W. Eury, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6

Light Company.

My commission expires: // 4 7 gP

,'OTARy:.

PUB/(Q o'

iowan ~lllill

L l

I p

+ /'j~)tg ~> ~

" ~~IOClth~'

ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT CHLORINE DETECTION SYSTEM BASIS FOR CHANGE RE UEST Pro osed Chan e

The proposed amendment revises the operability requirements of Technical Specification 3.3.3.7, Chlorine Detection Systems.

The current specification requires that two independent chlorine detector trains be operable in all Modes with each train consisting of a detector at each Control Room Area Ventilation System intake (both normal and emergency) and a detector at the chlorine storage area.

The proposed change will require the detectors at the chlorine storage area to be operable only when there is liquified chlorine in amounts in excess of 20 pounds stored at the chlorine storage area.

The operability requirements for the chlorine detectors located in the control room intakes are not affected by the proposed amendment.

Basis The Chlorine Detection System ensures that sufficient capability is available to promptly detect and initiate protective action in the event of an accidental chlorine release from either an onsite or an offsite location.

The proposed amendment does not reduce the ability of the Chlorine Detection System to perform its intended function.

The change wil'merely allow the chlorine detectors located at the chlorine storage area to be inoperable when less than 20 pounds of liquified chlorine is stored at the chlorine storage area.

The 20 pound limit is based on Regulatory Guide 1.95 which exempts small quantities of liquified chlorine (20 pounds or less) from consideration.

Movement and use of chlorine at SHNPP will continue to meet the guidance of Regulatory Guide 1.95.

The remote detectors at the chlorine storage area were installed in accordance with Regulatory Guide 1.95 which requires remote chlorine detectors located at the chlorine storage and unloading location for facilities with Type V control rooms (such as SHNPP).

The purpose of the storage area detectors is to alarm and isolate the control room in the event of an accidental release of chlorine at the storage area.

The remote chlorine detectors are not relied on to provide protection from an offsite chlorine release.

Should an accidental offsite release

occur, the probability of the remote detectors providing control room isolation in advance of the detectors located in the control room air intakes is minimal since this would be highly dependent on the location of the spill and wind direction.

As such, their operability is required PAGE 1/2

only when liquified chlorine is being stored at the chlorine storage area.

The detectors located in the control room ventilation intakes provide offsite release protection.

These detectors alarm and isolate the control room if necessary in the event of an offsite release of chlorine.

This is consistent with Regulatory Guide 1.78 which requires Type A and B control rooms (SHNPP has a Type B control room) to have the capability of detecting at the control room fresh air intake those hazardous chemicals stored or transported near the site.

The operability requirements for the chlorine detectors located in the control room intakes are not affected by the proposed amendment.

At present, liquid sodium hypochlorite in concentrations of 15 weight percent or less is used for water treatment at SHNPP.

As such, liquified chlorine is not being stored at the chlorine storage area.

PAGE 2/2

ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LI'CENSE AMENDMENT CHLORINE DETECTION SYSTEM 10CFR50.92 EVALUATION The Commission has provided standards in 10CFR50.92(c) for determining whether a significant hazards consideration exists.

A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety.

Carolina. Power 6 Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards consideration.

The bases for this determination are as follows:

Pro osed Chan e

The proposed amendment revises the operability requirements of Technical Specification 3.3.3.7, Chlorine Detection Systems.

The current specification requires that two independent chlorine detector trains be operable in all Modes with each train consisting of a detector at each Control Room Area Ventilation System intake (both normal and emergency) and a detector at the chlorine storage area.

The proposed change will require the ¹tectors<<at the chlorine storage area.to be operable only when there is liquified chlorine in amounts in excess of 20 pounds stored at the chlorine storage area.

The operability requirements for the chlorine detectors located in the control room intakes are not affected by the proposed amendment.

Basis The change does not involve a significant hazards consideration for the following reasons:

The proposed amendment does not involve an increase in the probability of an accident previously evaluated because the change will not affect any systems or equipment which are involved in the initiation of any previously analyzed accident.

The proposed change allows the chlorine detectors located at the chlorine storage area to be inoperable when 20 pounds or less of liquified chlorine is stored at the chlorine storage area.

The Chlorine Detection System ensures that sufficient capability is available to promptly detect and initiate protective action in the event of PAGE 1/3

an accidental chlorine release.

Changing the operability requirements of the Chlorine Detection System can not affect the probability of an accidental release of chlorine.

The proposed amendment does not reduce the ability of the Chlorine Detection System to perform its intended function.

The change will merely allow the chlorine detectors located at, the chlorine storage area to be inoperable when 20 pounds or less of liquified chlorine is stored at the chlorine storage area.

The remote detectors at the chlorine storage area were installed in accordance with Regulatory Guide 1.95 which requires remote chlorine detectors located at the chlorine storage and unloading location for facilities with Type V control rooms (such as SHNPP).

The purpose of the storage area detectors is to alarm and isolate the control room in the event of an accidental release of liquified chlorine stored at the storage area.

The remote chlorine detectors are not relied on to provide protection from an offsite chlorine release.

Should an accidental offsite release

occur, the probability of the remote detectors providing control room isolation in advance of the detectors located in the control room air intakes is minimal since this would be highly dependent on the location of the spill and wind direction.

As such, their operability is required only when liquified chlorine is being stored at the chlorine storage area.

The 20 pound limit is based on Regulatory Guide 1.95 which exempts small quantities of liquified chlorine (20 pounds or less) from consideration.

Movement and use of chlorine at SHNPP will continue to meet the guidance of Regulatory Guide 1.95.

The detectors located in the control room ventilation intakes will alarm and isolate the control room if necessary in the event of an offsite release of chlorine.

This is consistent with Regulatory Guide 1.78 which

~ requires Type A and B control rooms (SHNPP has a Type B control room) to have the capability of detecting at the control room fresh air intake those hazardous chemicals stored or transported near the site.

The operability requirements for the chlorine detectors located in the control room intakes are not affected by the proposed amendment.

Based on this. reasoning, the Company has determined that the proposed change does not involve an increase in the consequences of a previously evaluated accident.

The proposed change to Technical Specification 3.3.3.7 does not require the use of a new or different system than currently

exists, nor does it require existing systems to perform functions for which they were not originally designed.

Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.

The Chlorine Detection System ensures that sufficient capability is available to promptly detect and initiate protective action in the event of an accidental chlorine release.

The proposed amendment does not reduce the ability of the Chlorine Detection PAGE 2/3

System to perform its intended function.

The change will merely allow the chlorine detectors located at the chlorine storage area to be inoperable when 20 pounds or less of liquified chlorine is stored at the chlorine storage area.

The remote detectors at the chlorine storage area were installed in accordance with Regulatory Guide 1.95 which requires remote chlorine detectors located at the chlorine storage and unloading location for facilities with Type V control rooms (such as SHNPP).

The purpose of the storage area detectors is to alarm and isolate the control room in the event of an accidental release of liquified chlorine stored at the chlorine storage=area.

The remote chlorine detectors are not relied on to provide protection from an offsite chlorine release.

Should an accidental offsite release

occur, the probability of the remote detectors providing control room isolation in advance of the detectors located in the control room air intakes is minimal since this would be highly dependent on the location of the spill and wind direction.

As such, their operability is required only when liquified chlorine is being stored at the chlorine storage area.

The 20 pound limit is based on Regulatory Guide 1.95 which exempts small quantities of liquified chlorine (20 pounds or less) from consideration.

Movement and use of chlorine at SHNPP will continue to meet the guidance of Regulatory Guide 1.95.

The detectors located in the control room ventilation intakes will alarm and isolate the control room if necessary in the event of an offsite release of chlorine.

This is consistent with Regulatory Guide 1.78 which requires Type A and B control rooms (SHNPP has a

Type B control room) to have the capability of detecting at the control room fresh air intake those hazardous chemicals stored or transported near the site.

The operability requirements for the chlorine detectors located in the control room intakes are not affected by the proposed amendment.

Therefore, the proposed amendment does not involve'a.'reduction in the margin of safety.

PAGE 3/3

ENCLOSURE 3

SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400

'OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT CHLORINE DETECTION SYSTEM TECHNICAL SPECIFICATION PAGE