ML18005A408

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/88-07 on 880328-31.No Violations or Deviations Noted
ML18005A408
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/22/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A409 List:
References
NUDOCS 8805030089
Download: ML18005A408 (5)


See also: IR 05000400/1988007

Text

ACCEIZRATZD

DISTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

0

ESSION NBR:8805030089

DOC.DATE: 88/04/22

NOTARIZED: NO

ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

COLLINS,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power

& Light Co.

DOCKET

05000400

SUBJECT:

Forwards Insp Rept 50-400/88-07

on 880328-31.No violations

or deviations noted.

6/

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

05000400

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB

11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OGC 15-B-18

RES/DRPS

DIR

ERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY,B

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS

DXR 9A

OE LXEBERMAN,J

REG FXL~

02

RGN2

FILE

01

NRC

PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

A

TOTAL NUMBER OF COPIES

REQUXRED:

LTTR

24

ENCL

24

r.

APR 32

1988

Docket No. 50-400

License

No.

NPF-63

Carolina

Power and Light Company

PA:

Nr.

E.

E. lltley

Senior Executive Yice President

Power

Supply and Engineering

and Construction

P.

0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-400/88-07

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

W. J.

Ross

on

March 28-31,

1988.

The

inspection

included

a

review of

activities authorized for your Shearon

Harris facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

~

~

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

0 jileal siylh'd k~ c lli bosey

Douglas

M. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

Enclosure:

Inspection

Report

cc w/encl:

(See

page

2)

.SS05030089

S80402

PDR

ADOCK 05000400

Cl

DCD

Carolina

Power and Light Company

cc w/encl:

M. A. Watson,

Vice President

Harris Nuclear Project

P.

L. Tibbitts, Director of Regulatory

Compliance

~L. Harness,

Plant General

Manager

bcc w/encl:

LK Barth,

OGC

~C Resident

Inspector

W Upchurch,

Chairman, Triangle J

Council of Governments

DRS Technical Assistant

Document Control

Desk

State of North Carolina

RI I

~ oss

4/ig/88

RI I

Kah e

O/ ig/88

RII

P redrickson

4/QO/88

r

~