ML18005A379
| ML18005A379 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/30/1988 |
| From: | Watson R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CON-NRC-617 HO-880091(O), NUDOCS 8804060454 | |
| Download: ML18005A379 (2) | |
Text
REGULATORY INFQRMATION DISTRIBUTION SYSTEM
( R IDS )
ACCESSION NBR: 8804060454 DOC. DATE: 88/03/30 NOTARIZED:
NO FACIL: 50-400 Shearon Harris Nuclear Power Plant.
Unit ii Carolina AUTH. NAME AUTHOR AFFILIATION NATSONi R. *.
Carolina Power b Light Co.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET ¹ 05000400
SUBJECT:
Responds to Violation "A" noted in Insp Rept 50-400/86-77.
Review to-confirm adequacy of in-house design of Seismic Class I steel completed 0 final rept on file For NRC insp.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED: LTR J ENCL +
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Application for permit renewal filed.
05000400 RECIPIENT ID CODE/M*ME PD2-1 PD INTERN*L: ACRS DEDRO NRR/DLPG/PEB 11 NRR/DQEA DIR 11 NRR/DREP/RPB10A NRR/PM*S/ILRB12 QGC 15-9-18 RES/DRPS DIR COPIES LTTR ENCL 1
1 1
1 1
1 RECIPIENT ID CODE/NAME BUCKLEY'S B AEOD NRR 'OR ISSEAUi D NRR/DLPG/GAB 10 NRR /DREP /EP 8 10D NRR/DR IS DIR9A2 OE IEBERMANe J EG F L 02 ILE 01 CQP IES LTTR ENCL EXTERNAL:
LPDR NSIC NRC PDR TOTAL NUMBER OF'OPIES REQUIRED:
LTTR 24 ENCL
CPRL Carolina Power 8 Light Company HARRIS NUCLEAR PROJECT P.
O.
Box 165 New Hill, North Carolina 27562 NAB 50 3988 File Number'.
SHF/10-13510E Letter Number, H0-880091 (0)
NRC-617 Document'ontrol Desk.
United States Nuclear Regulatory Commission Washington, DC 20555 r
\\
NRC I.E.
REPORT 50-400/86-77 VIOLATION "A" Gentlemen:
The purpose of this letter is to inform you that in regard to the "above referenced violation, full compliance has now been achieved as committed to in CPhL re'sponse (NRC-587) dated October 30, 1987.
The review to confirm the adequacy of in-house design of, Seismic Class I steel has now been completed and final reports are on file for your inspection.
The conclusion reached is that the Seismic Class I
steel design is satisfactory.
If you have any questions regarding this matter; please do not hesitate to contact me.
Yours very truly, g6ccJ~
R. A. Watson Vice President Harris Nuclear Project cc'Mr. B. C. Buckley (NRC)
Dr. J.
N. Grace (NRC)
Mr. G. F. Maxwell (NRC-SHNPP) 8804060454 880330 PDR ADOCN, 05000400 6
PDR MEM/HO-8800910/1/OS1