REGUL RY. INFORMATION DISTR IBUT SYSTEM "(RIDS)
ACCESSION NBR: 8804060054 DQC. DATE: 88/03/24 NOTARIZED: YES FACIL: 50-400 Shearon Harv is Nuc lear Poeer Plant'nit ii Cav'olina AUTH. NAME AUTHOR AFF ILIATION EURYi L. W.
Carolina Poeer h Light Co.
RECIP. NAME REC IP IENT AFFILI*TIQN GRACEi J. N.
Region 2i Ofc of the Director
SUBJECT:
Responds to'RC Bulletin 88-002i "Rapidly Propagating Fatigue Cv acks in'team Generatov'ubes.
" Rept eill be submitted eithin 45 days of completing steam genevator inservice insps scheduled For upcoming v efueling outage.
DISTRIBUTION CODE:
IE11D COPIES RECEIVED: LTR l ENCL 0 SlZE:
TITLE: Bulletin Response (50 DKT>
NOTES: Application fov pevmit renewal filed.
DOCKET r
05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY B INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DEST/ADS 7E NRR/DOEA/EAB11E,
/EPB10D E
02 RGN2 F ILE 01 COPIES LTTR ENCL 1'
1 1
1'1 RECIPIENT
.ID CODE/NAME PD2-1 PD
- EOD/DSP NRR/DEST/ADE 8H NRR/DEST/MEB 9H NRR/DQEA/GCB 11A NRR /P MAS/ILR8 12 RES/DE/EIB COPIES LTTR ENCL 1
1 1
1 1
1 1
EXTERNAL:
LPDR NSI C NRC PDR TOTAL NUMBER QF COPIES REQUIRED:
LTTR 19 ENCL
Caroiina Power 8 Light Company P. O. Box 155t
~ Rafelgh, N. C. 27602
,"n I;; ~
~<o I".:; Sg,g.IAL: NLS-88-070 MAR 24 M8 1
LYNN W. EURY Senior Vice President Operations Support Dr. 3. Nelson Grace, Regional Administrator United States Nuclear Regulatory Commission 101 Marietta Street, NW Atlanta, GA 30303 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-000/LICENSE NO. NPF-63 RESPONSE TO NRC BULLETINNO. 88-02: RAPIDLY PROPAGATING FATIGUE CRACKS IN STEAM GENERATOR TUBES
Dear Dr. Grace:
Bulletin No. 88-02 requested that holders of operating licenses for Westinghouse designed nuclear power reactors with steam generators having carbon steel support plates review steam generator inspection data for evidence of denting of the uppermost support plate.
In addition, actions. were specified to minimize the potential for a steam generator tube rupture event caused by a rapidly propagating fatigue crack.
The Shearon Harris Nuclear Power Plant (SHNPP) is currently operating in the initial fuel cycle and has not yet g
erformed an inservice inspection of the steam generators.
The information requested y Bulletin No. 88-02 is, therefore, hot available at this time. Steam generator inspections are planned for the upcoming refueling outage, currently scheduled to begin 3uly 16, 1988, and end September 16, 1938. A report detailing the status of our compliance with the Bulletin actions willbe submitted within 05 days of completing the steam generator inservice inspection report as required by SHNPP Technical Specif ication 0.0.5.5(b).
Should you have any questions regarding this topic, please contact Mr. Arnold Schmich at i(919) 896-8759.
Yours very truly, AWS/che (5397AWS) cc:
Mr. B. C. Buckley Mr. G. F. Maxwell NRC Document Control Desk L. W. Eury 8804060054 880324 PDR ADOCK 05000400 8
PDR L. W. Eurv, haying been first duly sworn did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents,,gas>>rrrr>
Carolina Power R Light Company.
o ry 'ea, ARY:.
My commission expires: // Q r7 gg
~slisssss<