ML18005A261

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/87-40 on 870924-1127 & Notice of Violation.One Issue from Insp Rept 50-400/87-37 Contained in Encl Notice of Violation.Concerns Expressed Over Valve Operability Determinations During Events of Feb & Oct 1987
ML18005A261
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/29/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A263 List:
References
NUDOCS 8802080252
Download: ML18005A261 (3)


See also: IR 05000400/1987040

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION

NBR: 880 080252

DOC. DATE: 88/01/29

NOTARIZED:

NO

FACIL: 50-400 Shearon

Harris NucleaT

Poeer

Plant~

Unit ii Carolina

AUTH. NAME

AUTHOR AFFILIATION

GRACEi J. N.

Region

2i

Ofc of the Director

REC IP. NAME

RECIPIENT AFFILIATION

UTLEYiE. E.

Carolina Pacer

b Light Co.

DOCKET

05000400

SUBJECT:

Forwards

Insp Rept 50-400/87-40

on 870924-1127

0 notice of

vioiation. One issue

from Insp Rept 50-400/87-37

contained

in

encl notice of violation. Concerns

expressed

over valve

operabil itg determinations

during events

of Feb

5 Oct

1'F87.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED: LTR

ENCL

SIZE:

TITLE: General

<50 Dkt)-Insp Rept/Notice of Violation Response

NOTES: Application for permit renewal filed.

05000400

RECIPIENT

ID CODE/NAME

PD2-1

PD

COPIES

LTTR ENCL

1

1

REC IP IENT

ID CODE/NAME

BUCKLEY> B

COPIES

LTTR ENCL

2

2

INTERNAL:

AEOD

I'lRR

MOR ISSE*U> D

NRR/DOEA DIR

NRR/DREP/RPB

NRR/PMAS/ ILRB

OGC/HDS1

RES/DRPS

DIR

XTERNAL:

LPDR

NSIC

1

1

P)

1

1

1

1

1

1

1

DEDRO

NRR/DLPQ/PEB

NRR/DREP/EPB

NRR/DR IS DIR

OE LIFBERMANiJ

REG

RGN2

FILE

01

NRC

PDR

1

1

1

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

21

ENCL

21

January

29,

1988

Docket No.

50-400

License

No.

NPF-63

C

olina Power and Light Company

~

~

~

~

~

TN:

Mr.

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NO. 50-400/87-37

AND NRC INSPECTION

REPORT

NO. 50-400/87-40)

This refers to the Nuclear Regulatory

Commission

(NRC) inspections

conducted

by

G.

F ~ Maxwell

on

September

24 - October 27,

1987 and October

27 - November 27,

1987.

The

one

issue

from Inspection

Report 50-400/87-37

transmitted

by this

letter

is contained

in violation

A of the enclosed

Notice of Violation.

The

report documenting that inspection

was sent to you by letter dated

November 10,

1987.

The

remaining

issues

addressed

in this letter pertain to Inspection

Report

50-400/87-40.

Inspection

Report

50-400/87-40

included

a

review of

activities

authorized

for your Harris facility.

At the conclusion of this

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during this inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

The inspection

findings indicate that certain activities

appeared

to violate

NRC requirements.

Based

on additional information discussed

at the enforcement

conference

conducted

with your staff

on November 20, 1987, violations

A and

B

in the enclosed

Notice of Violation have

been

categorized

at Severity Level

IV.

The violations,

references

to pertinent requirements,

and elements

to be

included in your response

are

described

in the enclosed

Notice of Violation.

In addition to the enclosed

violations,

we are also concerned

over your valve

operability

determinations

during the

events

of February

and October

1987

involving reactor

coolant

system

vent

(RCSV) valve spurious

actuations.

Our

position is that the

RSCV valves that were pressurized

open during these

events

should,

in fact,

have

been

declared

inoperable.

As such,

we are requesting

that

you include in your

response

an evaluation of your process

for making

operability determinations

and identify any appropriate

changes

you have

made

or will make to strengthen this process.

8802080252

880i29

PDR

ADOCK 05000400

G

PDR

Carolina

Power and Light Company

January

29,

1988

The violation described

in the

enclosed

Inspection

Report,

paragraph

3 is

similar to

a violation contained in the Notice sent to you by our letter dated

September

8,

1987.

'Because

"similar violations,"

as

described

in the

NRC

Enforcement

Policy,

are

of significant

concern

to the

NRC,

please

give

particular attention

in your response

to the identification of the root cause

of this problem and your corrective action to prevent recurrence.

In accordance

with Section

2. 790 of the

NRC's

"Rules of Practice,"

Part

2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this letter, please

contact

us

~

Sincerely,

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report 50-400/87-40

cg w/encls:

R.

A. Watson,

Vice President

Harris Nuclear Project

dK

L. Tibbitts, Director of Regulatory

ompliance

L. Willis, Plant General

Manager

J.

Nelson Grace

Regional Administrator

bcc w/encls:

LR Barth,

OGC

Resident

Inspector

. Upchurch,

Chairman,

Triangle J

Council of Governments

DRS Technical Assistant

Document Control Desk

~ RII

RII

g.VII'i

SVias:tm

5~ PFredr ickson

01/

/88

"'1/tb /88

.RIIj

DVerre1 1 i

01/

/88

RIIjyP

CWHehl

01/~P/88

R

', 1

/88

RII

GJenki

s

01/gp/88

RII

e-~

MErns

01/

/88