Responds to NRC 870121 SER Concerning Util Compliance W/Reg Guide 1.97,Rev 2 Re Accumulator Tank Pressure.Mods Re Accumulator Pressure or Level Instrumentation Should Be Deferred Until Qualification Issue Resolved.Fee Paid
ML18005A233
Person / Time
Site: Harris 
Issue date: 12/10/1987
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NLS-87-272, NUDOCS 8712170226
Download: ML18005A233 (4)


Text

,AGCELERkTED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8712170226 DOC. DATE: 87/12/10 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)

DOCKET 05000400

SUBJECT:

Discusses NRC 870121 SER evaluating util compliance w/Reg Guide 1.97,Rev 2 re accumulator tank pressure.

DISTRIBUTION CODE:

A003D COPIES RECEIVED:LTR J-ENCLg SIZE:

TITLE: OR/Licensing Submittal:

Suppl 1 to NUREG-0737 (Generic Ltr 2-33)

NOTES:Application for permit renewal filed.

05000400g RECIPXENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL QN~

LFMB REG F 01 RES/DE/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-1 PD NRR/DLPQ/HFB RES DEPY GX NRC PDR COPIES LTTR ENCL A

g R

I D

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL

~1

/

~t 0 CNILL Carottna Power 8 Ught Company R O. Bex 1551

~ Raleigh. N. C. 27602 OEC 10 NST R. B. RICHEY, Manager Llcenslng 6 Nuclear Fuel Department SERIAL: NLS-87-272 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-000/LICENSE NO. NPF-63 REGULATORY GUIDE 1.97, REVISION 2 ACCUMULATORTANK PRESSURE AND LEVEL INSTRUMENTATION Gentlemen:

In a letter dated 3anuary 21, 1986, the NRC transmitted a Safety Evaluation Report (SER) documenting the Staff's review of the SHNPP compliance to Regulatory Guide (RG) 1.97, Revision 2. The SER required CPkL to designate'either level or pressure as the key variable to determine accumulator discharge and provide instrumentation for that variable which meets the requirements of 10 CFR 50.09.

The SER required the qualified accumulator tank level or pressure instrumentation to be installed and operational during the first scheduled outage of sufficient duration, but no later than start up following the first refueling outage.

Carolina Power R Light Company believes that the existing instrumentation and Technical Specification limits provide adequate assurance that the accumulator tank is available to perform its intended safety function. Furthermore, the design and procedures at SHNPP do not use either accumulator tank level or pressure instrumentation in a post-accident scenario, as such, it is not necessary that they be environmentally qualified for a harsh environment.

Carolina Power R Light Company has previously documented this position in letters dated 3une 3, 1985 and February 6, 1986.

Carolina Power dc Light Company has learned that the NRC is reviewing the environmental qualification requirements for this instrumentation on another docket.

As such, CPRL requests to defer any modifications associated with the accumulator pressure or level instrumentation until the qualification issue is resolved.

Should any modifications be required upon resolution of this issue, a mutually agreed upon installation schedule willbe established.

pO r

8712170226 871210 CD PDR;.

ADOCK 05000400 k,

s

'u-Document Control Desk NLS-87-272 / Page 2 The'Company has evaluated this request in accordance with the provisions of 10 CFR 170.12 and determined that an application fee is required.

A check for $ 150 is enclosed in payment of this fee.

Please refer any questions regarding this matter to Mr. Sherwood R. Zimmerman at (919) 836-6202.

Yours very truly, LMR/vtn (53053DK)

Enclosure R. B. Richey cc:

Mr. B. C. Buckley Dr. 3. Nelson Grace Mr. G. F. Maxwell

0 r,~