~~.~eOI

,~C Wp0 o

C O

I C

0 Op

+~

~O

+p*~4 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER 8

LIGHT COMPANY, et al.

DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

2 License No.

NPF-63 1.

The Nuclear Regulatory Commission (the COImission) has found that:

A.

The application for amendment by Carolina Power 5 Light Company, (the licensee),

dated October 15,

1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No.

NPF-63 is hereby amended to read as follows:

87li030~57 8

0400 pDR

,ADOCK 0800 DR

i'I I

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached

hereto, as revised through Amendment No.

2

, are hereby incorporated into this license.

Carolina Power 5 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION fw(

Gus C. Lainas, Assistant Director for Region II Reactors Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

October 30, 1987 See previous concurrence page~

LA:PD21: DRPR, PM: PD21: DRPR

  • PAnderson/dsf

'-BBuckley 10/23/87 10/pp/87

DRPR Ad nsam 10/$0/87 OGC-B DR2 DRPR GLi s

10/23/87 10/)$ 87

'e t

I'

ATTACHhiENT TO LICENSE AMENDMENT AHENDYiENT NO.

2 FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised areas are indicated by marginal lines.

Remove Pa e

3/4 8-8 Insert Pa e

3/4 8-8

ELECTRICAL POWER SYSTEMS A. C.

SOURCES OPERATING SURVEILLANCE RE UIREMENTS Continued) 8.

9.

10.

12.

Verifying the diesel generator operates"" for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to 6800-7000 kW*"" and, during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to an indi-cated 6200-6400 kW*~*.

Within 5 minutes after completing this 24-hour test, perform Surveillance Requirement 4.8. 1. 1.2.f.6 b).

Verifying that the auto-connected loads to each diesel generator do not exceed the continuous rating of 6500 kW; Verifying the diesel generator's capability to:

a)

Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a

simulated restoration of offsite power, b)

Transfer its loads to the offsite power source, and c)

Proceed through its shutdown sequence.

Verifying that the following diesel generator lockout features prevent diesel generator operation:

a)

Engine overspeed b)

Generator differential c)

Emergency bus differential d)

Emergency Stop e)

Operational and maintenance switch in the maintenance mode f)

Loss of generator potential transformer circuit Verifying the generator capability to reject a load of between 6200 and 6400 kW without tripping.

The generator voltage shall not exceed llOX of the generator voltage at the start of the test during and following the load rejection; Verifying that, with the diesel generator operating in a test mode and connected to its bus, a simulated Safety Injection signal overrides the test mode by:

(1) returning the diesel generator to standby operation and (2) automatically energizing the emergency loads with offsite power.

""This test shall be conducted in accordance with the manufacturer's recommen-dations regarding engine prelube and warmup procedures, and as applicable regarding loading recommendations.

"""This band is meant as guidance to avoid routine overloading of the engine.

Loads in excess of this band for special testing or momentary variations due to changing bus loads shall not invalidate the test.

8If Specification 4.8. 1. 1.2f.6 b) is not satisfactorily completed, it is not necessary to repeat the preceding 24-hour test.

Instead, the diesel gener-ator may be operated at 6200-6400 kW for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or until operating temper-ature has stabilized.

SHEARON HARRIS " UNIT 1 3/4 8-8 Amendment No.