hrGUL ORY INFORMATION DISTR IBUTTDN SYSTEM (RIDS) 1 ACCESSION NBR: 8708270387 DOC. DATE: 87/08/18 NOTARIZED:
NO FACIL: 50-400 Shearon Harv is Nuclear Power Planti Unit ii Carolina AUTH. NAME AUTHOR AFFILIATION HERDTI A. R.
Region 2I Office of Director RECIP. NAME RECIPIENT AFFILIATION UTLEYIE. E.
Cav olina Powev 5 Light Co.
SUBJECT:
Forwards v equest fov addi info v'e util responses to IE Bulletin 85-003'Motor-Opev ated Valve Common Failures During Plant Tv ansient Due to Impropev Switch Settings.
Response
requested within 30 dags of ltv'eceipt.
DISTRIBUTION CODE:
IEIID COPIES RECEIVED. LTR t
ENCL J SIZE.
TITLE: Bulletin Response (50 DKT)
NOTES: Application for pev mit v enewal filed.
DOCKET 05000400 05000400 REC IP IENT ID CODE/NAME PD2-1 LA BUCKLEY'S B COPIES LTTR ENCL 1
0 1
1 REC IP IENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
1 INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DEST/ADS NRR/DOEA/GCB NRR/PMAS/ILRB RES/DE/EIB 1
1 1
1 1
1 1
1 1
1 1
1
- EOD/DSP NRR/DEBT/ADE NRR/DOE*/EAB NRR/DREP/EPB RE
~~t 02
%GN2 FILE 01 EXTERNAL:
LPDR NSIC 1
1 1
1 NRC PDR TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL 17
0 ~
0 ~
RU8
], 8 1887
~
yA Carolina Power and Light Company v ATTN:
MIr. E.
E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0.
Box 1551
- Raleigh, NC 27602 Gentlemen:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION CONCERNING HARRIS'ESPONSES TO IEB 85-03 (DOCKET NO. 50-400)
The Nuclear Regulatory Commission is continuing its review of responses to IEB 85-03, "Motor Operated Valve Common Mode Failures During Plant Transient Due to Improper Switch Settings."
The review indicates the need for additional information before the program to assure valve operability can be approved for your facility.
Please provide the additional information as stated in the enclosure.
It is requested that you submit the additional information within 30 days of the date of this letter.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Enclosure:
Request for Additional Information jcc w/encl:
~ R. A. Watson, Vice President Harris Nuclear Project g D. L. Tibbitts, Director of Regulatory Compliance
~ J.
L. Willis, Plant General Manager Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety 8708270387 870818 PDR ADOCK 05000400 Q
PDR i bcc w/encl:
~ C; Barth, OGC kNRC Resident Inspector 4A: Upchurch, Chairman, Triangle J Council of Governments Ai Gibson A. Herdt--
F.
Jape R; Kiessel, NRR Document Control Desk State of North Carolina P. Fredrickson RII 8/t /87 RI I FJap 08/
/87
(
RII Qz PFredrickson 08/pi-/87
~ ~
0 ~
ENCLOSURE REQUEST FOR hDDITIONhL INFORMhTION (RhI) RE:
Review of Responses to hction Item e of IE Bulletin 85-03 Licensee:
Carolina Pover 8 Light Company 411 Fayettcville Street P. 0.
Box 1551 Raleigh,,NC 27602 Unit(s): Harris 1
Date of Response:
05-13-86 07-25-86 03-04-8?
Respondent:
- h. B. Cutter Vice President, Nuclear Engineering and Licensing The information provided in your response to hction Item e of IE Bulletin 85-03 vas found to bc dcficicnt in some areas.
Plcasc provide the additional information necessary to resolve the folloving comments and questions:
1.
The folloving MOVs of thc HPSI system are not included in Table 1 of thc response of 05-13-86.
However, similarly located MOVs of another Meetinghouse three-loop plant are listed for inspection in accordance vith bulletin requirements.
Please revise Table 1 to include these MOVe, or )ustify their exclusion.
hs required by hction Item a of thc bulletin, consider the effect of inadvertent equipment operations.
(a) Unlisted MOVs 8130h,
- 8130B, 8131h and 8131B are shovn normally open in series in a crossover linc providing suction for the charging pumps, in Zone J-11 of Drawing ChR-2165-G-0805, Revision 14.
(b) Unlisted MOVs 8132h,
- 8132B, 8133h and 8133B are shovn normally open in series in a crossover line on thc discharge side of the charging pumps, in Zone I-7 of the drawing identified above.
2.
Has water hammer due to valve closure been considered in the determination of pressure differentials2 If not, please explain.
- 3. Please expand thc proposed program for action items b, c, and to include the folloving details as a minimum:
)I
Enclosure I
(a) commitment to a training program for setting svitches, maintaining Talkee operators, using test equipment and interpreting t'est results, and (b) description of a method possibly needed to eztrapolate valve stem thrust measured at lese than maximum differential pressure.
- 4. hccording to Section k of httachaent 1 of the response of 03-04-87, "The 4 percent positions are determined by the total number of handvheel turns for the Yalve (listed on the data sheet)".
This method is not recommended, because one of the problems at Davis-Besse l reported in IEB 85-03 resulted from counting handvheel turns.
Please provide a description of hov that problem at Davis-Besse 1 vill be compensated for at your facility.