{{#Wiki_filter:"I "ACCESSION NBR: FAC IL: 50-400 AUTH. NAME WATSON'. A. REC IP. NAME R Y INFORMATION DISTRI I SYSTEM (RIDB) 8706250274 DOC. DATE: 87/06/1'P NOTARlZED: NO Bhearon Harris Nuclear Poeer Planti Unit 'ii Carolina AUTHOR AFFILIATION Carolina Power 5 Light Co. REC IP lENT AFFILIATION Document Control Branch (Document Control Desk) DOCKET 05000400
SUBJECT:
Informs that util intends to declare start-up test program complete on 870701. Ttbo outstanding preoperational tests remain to be completed. Description of current status Zc plans enc l. DISTRIHUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE: TITLE: OR Submittal: General Distribution NOTES: Application for permit reneeal filed. 05000400 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY. 8 INTERNAL: ACRB NRR/DEBT/*DE NRR/DOEA/TSB OQC/HDS1 COPIES LTTR ENCL 1 0 1 1 6 6 1 1 1 0 RECIPIENT ID CODE/NAME PD2-1 PD ARM/DAF/LFMB NRR/DEBT/ADB RH REQ FILE COPIES LTTR ENCL 5 5 1 0 1 1 1 1 1 1 EXTERNAL: EQSQ BRUSKEi S NRC PDR 1 1 1 1 LPDR NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 21
0 ~ l N y i
0 0 CSCK Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, NC 27562 JUN 1 i 15dl File Number'SHF/10-13518E Letter Number'. HO-870444 (0) NRC-561 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 INITIALTEST PROGRAM References.'etter dated December 19,
- 1986, from R. A. Watson to Dr. J. Nelson Grace Letter dated December 29,
- 1986, from R. A. Watson to Dr. J.
Nelson Grace Gentlemen.'arolina Power 6 Light Company (CP&L) intends to declare the Start-Up Test Program at the Shearon Harris Nuclear Power Plant (SHNPP) to be complete on July 1, 1987. The above referenced letters describe the status of the Start-Up Program prior to issuance of the full power operating license. There are two outstanding preoperational tests remaining to be completed. The attachment to this letter describes the current status and plans. Based on the fact that alternate means are currently in place for these remaining preoperational
- tests, the Start-Up Program will be declared complete as of July 1, 1987.
Very truly yours, 870/250274 870619 I PDR. ADOCK 05000400 'P-PDRQ R. A. Watson Vice President Harris Nuclear Project RAW/ONH/sdg Attachment cc. Mr. B. Buckley (NRR) Dr. J. N. Grace (NRC-RII) Mr. G. F. Maxwell (NRC-SHNPP) MEM/HO-8704440/Page 1/OS1
START-UP PROGRAM There are two outstanding preoperational tests remaining to be completed in the Start-Up Program. They are as follows: 1. 1-7045-P-02 Volume Reduction This preoperational test is for the polymer system and has not started. 2. 1-7045-P-05 Dr Products Stora e and Transfer This preoperational test is also for the polymer system and has not started. These remaining systems are not safety related. Currently, measures are in place that serve the functions of these systems. The plant solid waste needs will be handled by vendor provided services until the solid waste tests are complete. The Harris Plant Process Control Program (PCP) recognizes the possible need to use vendor services if equipment is out of service for any reason. The PCP was submitted to and approved by NRC staff in Supplement No. 3 to the Safety Evaluation Report (SSER 83). Carolina Power & Light Company (CP&L) currently has contracts in place with vendors to provide these services if they are required before the installed systems are placed into service. The equivalent measures CP&L has instituted for the Solid Waste Management System meet the requirements of 10CFR20.106, 10CFR50.34(a), and 10CFR71 as well as GDC 60, 63, and 64. Based upon the fact that we have alternate means currentLy in place for the remaining preoperational tests, it is our intent to declare the Start-Up Program complete as of July 1, 1987 and close out the Start-Up Program. The remaining preoperational tests that are not complete at that time will be shifted to the Technical Support Unit under the System Engineers for the responsibility and completion of the preoperational tests. Remaining Start-Up Work Lists items for these preoperational tests will be tracked using the Operations Work Request & Authorization (WR&A) Procedures. Test Exceptions will be shifted and tracke'd by the Technical Support System Engineers for closing. MEM/HO-8704440/PAGE 1/Osl