MAY ) p )987 Docket No. 50-400 License No. NPF-53 Carolina Power and Light Company ATTN:
Mr. E.
E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0.
Box 1551
- Raleigh, NC 27602 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- HARRIS NUCLEAR PLANT - DOCKET NO. 50-400 This letter refers to the meeting conducted at your request in the Region II office on May 1, 1987.
The meeting involved a presentation and discussion on, Balance of Plant Transients and Security System Improvements Status at'the Harris facility.
Enclosed is a summary of the meeting topics.
It is our opinion that this meeting was beneficial, and provided a better understanding of the test program status of the Feedwater and Condensate System and the status of the security upgrade review.
In accordance with Section 2.790 of NRC's Rules of Practice, "Part 2, Title 10, Code of Federal Regulations, "copy of this letter and the enclosures will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
8706l 50077 8705l3 PDR ADQCK 05000400 F
PDR Sincerely, (Original signed by V. Brownlee for)
Luis A. Reyes, Director Division of Reactor Projects
Enclosures:
1.
Meeting Summary - Balance of Plant Transients 2.
Attendance List
~
~
~
cc w/encls:
R. A. Watson, Vice President Harris Nuclear Project D. L. Tibbitts, Director of Regulatory Compliance J. L. Willis, Plant General Manager bcc w/encl:
(See page 2)
Carolina Power and Light Company Cc w/encls:
. Barth, OGC RC Resident Inspector Document Control Desk State of North Carolina
'Q. (,i8 SJVi s:cc 5gglSS RII PE redrickson 5/ia /87
ENCLOSURE 1
MEETING
SUMMARY
- BALANCE OF PLANT TRANSIENTS AND SECURITv PROGRAM Licensee:
Facility:
Docket:
License No.:,
CPSL Harris 50-400 NPF-53
SUBJECT:
Balance of Plant Transients A meeting was held in the NRC Region II office on May 1, 1987, to discuss the Harris test program status and reactor trips due to the feedwater and conden-sate systems.
Region II began this meeting by stating that the NRC's main concerns were the safety systems challenges from the reactor trips caused by transients of the feedwater and condensate systems.
CPSL discussed in detail, the sub-tiered causes of the reactor trips generated from the secondary
- side, along with a description of the secondary system configuration and design changes intended to fix the problem.
CPSL also provided a
summary of the remaining power range testing to be completed, and indicated a tentative schedule for completion.
Also discussed was their systematic approach to the secondary plant problems.
CPSL gave a brief status of their Security System improvements and how their task force organization is identifying problem areas and recommending fixes, both long term and short term.
The NRC noted that CPSL has shown significant improvement in their security program upgrade.
Region II concluded the meeting with a final discussion.
Region II stated that CPKL has shown that the plant has been aggressive in their corrective actions for both the secondary side transients and the security problems.
au re roc son, ie Projects Section 1A Reactor Projects Branch 1
Division of Reactor Projects W /p Da e
0
ENCLOSURE 2
ATTENDANCE LIST Attendance at the CP&L -
NRC meeting on Nay 1,
- 1987, at the NRC Region II office.
CPSL N. A. NcDuffie J. L. Willis J.
N. Grace H. L. Ernst L. A. Reyes A. F. Gibson J.
P. Stohr D. N. Verrelli NRC C. S. Hinnant S.
R.
Zimmerman P.
E. Fredrickson S. J. Vias N. B. Shymlock C.
D. Perny H. L. Whitener