ML18004B731
| ML18004B731 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/20/1987 |
| From: | Cutter A CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NLS-87-052, NLS-87-52, NUDOCS 8703250212 | |
| Download: ML18004B731 (4) | |
Text
REQULA Y INFORMATION DISTR IBUTI YSTEM (R IDS) s ACCESSION NBR: 87032502i2 DOC. DATE: 87/03/20 NOTARIZED:
NO FACIL:50-400 Shearon Harris Nuclear Poeer Planti Unit i. Carolina AUTH. NAME AUTHOR AFFILIATION CUTTER A. B.
Carolina Power 8e Lig ht Co.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk )
SUBJECT:
Provides addi info re inservice pump Cc valve testing program in response to NRC request. Procedure governing inservice pump 5 valve testing program mill be modified incorporated within 30 days after NRC SER issued to util.
DISTRIBUTION CODE:
B00iD COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR *mdts Zc Related Correspondence NOTES:Application for permit renewal filed.
DOCKET 0 05000400 05000400 REC IP IENT ID CODE/NAME PWR-A EB PWR-A FOB PWR-A PD2 PD PWR-A PSB INTERNAL: ACRS IE FILE IE/DGAVT/GAB NRR PWR-B ADTS NRR/DHFT/MTB EQ FI Oi EXTERNAL:
BNl (AMDTS ONLY)
LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PWR-A EICSB PWR-A PD2 LA BUCKLEY~ B PWR-A RSB ADM/LFMB IE/DEPER/EPB NRR BWR ADTS NRR ROEe M. L OGC/HDSi RM/DDAMI/MIB DMB/DSS (AMDTS)
NRC PDR PNL GRUEL> R COP IES LTTR Eh 2i 2i i
ii i
i 0
i i
ii TOTAL NUMBER OF COPIES REQUIRED:
LT1R 33 ENCL QQ
t J<<
j)/i
)t I<<
f= f I j W,fii
"')V "v
P<WW
)
'wgk'<<W)w W t ~
<<l,
"')Wll n <<
1 I ~,W
'f!"j ff w
. I j <<W,W<<
I W
I I 'i j
=
~<<)w ')
) 1'1
.".I 5 "I
<)'1'-
I<<OWI 1 <<)
)I
)IJ f
1 f, 1 I
PWC 1
'1 X )'~
~ W Vw<V fg
'W C
W I
If f<<
il
~i
CSQE Carolina Power 8 Light Company MAR 2 0 1987 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-000/LICENSE NO. NPF-63 IN-SERVICE PUMP AND VALVETESTING PROGRAM NRC REQUEST FOR ADDITIONALINFORMATION Gentlemen:
SERIAL: NLS-87-052 8703250212 870320 PDR ADOCK 05000400 In response to an NRC staff request, Carolina Power etc Light Company (CPRL) herein submits additional information concerning the In-service Pump and Valve Testing (IST)
Pr ogram.
This information supplements the IST Program, Revision 3, submitted on September 16, 1986 and amended in our submittal of December 31, 1986.
The staff requests are reiterated below followed by CPRL's response.
Request:
Why can't the throttle and governor valves for the auxiliary feedwater turbine driven pump be fullstroke exercised?
Response
The throttle valve can and willbe full stroke exercised on a quarterly basis.
The governor valve is hydraulically operated, drawing the hydraulic fluid from the AFW pump.
The AFW pump must be running for the governor valve to operate.
The governor valve's controller senses steam line pressure and turbine speed and automatically adjusts over a limited travel range to maintain AFW pump speed constant.
Full stroking of the governor valve (independent of the speed control function) while the pump is running can lead to overspeed of the pump.
Request:
It is implied that 1CE-56 willbe full stroke exercised on the way to a cold shutdown.
A statement verifying this is needed.
Response
Full stroke exercising of this valve willbe performed on the way to a cold shutdown when the auxiliary feedwater turbine driven pump is being tested.
The procedure governing the IST program willbe modified to incorporate these within 30 days after the NRC's SER is issued to CPRL.
C"'f you have any questions, please contact Mr. Steve Chaplin at (919) 836-6623.
You ery tr ABC/SDC/lah (5107SDC)
. Cutter -
ice sident Nuclear Engineering R Licensing cc:
Mr. B. C. Buckley (NRC)
Dr. 3. Nelson Grace (NRC-RII)
Mr. A. Masciantonio (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. C. Ransom (EGRG)
'1 t.iFayettevipte~Street o P. O. Box 1551 o Raleigh. N. C. 27602 r,
IIIoe BODED II
h l