ML18004B677

From kanterella
Jump to navigation Jump to search
Forwards Comments & Justification on Preliminary Draft of Proposed Full Power License
ML18004B677
Person / Time
Site: Harris 
Issue date: 01/02/1987
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-87-001, NLS-87-1, NUDOCS 8701140290
Download: ML18004B677 (6)


Text

RE('U ORY INFORNATIQN DISTRIBUT N SYSTEI'1 (R IDS)

"ACCESSIQN NBR: 8701140290 DOC. DATE: 87/01/02 NOTARIZED:

NQ DOCKET 0 FACIL:50-400 Sheav on Harv is Nuclear Power Plant~

Unit 1.

Gav olina 05000400 AUTH. NANE AUTHOR AFFILIATION ZINNERi~tANiS. R.

Carolina Power Zc Light Co.

RECIP. NANE RECIPIENT AFFILIATlQN DENTQNp H. R.

Office of Nuclear Reactor Regulation.

Direc tor (post 851125

SUBJECT:

Forwards comments h gusti fication, for pv oposed draft full-potoer license.

DISTRIBUTION CODE:

B001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Licensing Submittal:

PSAR/FSAR Amdts Zt Related Cov'respondence NOTES: Application for pevmit v eneeal filed.

05000400 RECIPIENT ID CODE/NAI'jE PWR-A EB PWR-A FOB PWR-A PD2 PD PWRM PSB INTERNAL: ACRS 41 ELD/HDS1 IE/DEPER/EPB 36 NRR BWR ADTS L

(

FILE 04 EXTERNAL: BNL(ANDTS ONLY)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

1 1

6 6

1 0

1 1

0 1

1 1

1 1

1 1

RECIP lENT ID CODE/NANE PWR-A EICSB PWR-A PD2 LA BUCKLEY>B 01 PWR-A RSB ADN/LFNB IE FILE IE/DGAVT/GAB 21 NRR PWR-B ADTS NRR/DHFT/NTB RN/DDANI/MIB DthB/DSS

(*NDTS)

NRC PDR 02 PNL ('RUEL> R CQr IES LTTR Er'CL 2

2 1

2 2

1 1

1 0

1 1

1 0

1 1

0 1

1 1

1 TOTAL NUi~lBER OF COPIES REQUIRED:

LTTR 33 ENCL 28

4

SME Carolina Power 8 Light Company JAN SERIAL: NLS-87-001 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT - UNIT NO.

1 DOCKET NO. 50-000/LICENSE NO. NPF-53 COMMENTS ON THE PRELIMINARYDRAFT OF THE PROPOSED LOW-POWER LICENSE

Dear Mr. Denton:

Carolina Power R.Light Company (CPRL), as requested by the NRC Staff, submits comments on the preliminary draft of the proposed full-power license for the Shearon Harris Nuclear Power Plant (SHNPP).

The attachment provides the comments and justification.

Submittal of these comments does not preclude our right to later appeal or contest the statements and conditions stated in the final license. If you have any questions, please contact me at your convenience at (919) 836-6231.

Yours very truly, ABC/GAS/kts (5113GAS)

Attachment cc:

Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. 3. Nelson Grace (NRC-Rll)

. R.

im erman er Nuclear Licensing Section R

gDOCK 8701 0 8>01140>P0 P

05000400 F'DR 411 Fayettevitte Street o P. O. Box 1551

~ Rateigh. N. C. 27602 pO 1 )

ATTACHMENT 1 TO NLS-87-001 (5113GAS/bee )

Comment No.

Page No.

License Reference Comment

~Footnote 2.C.1 Attachment 1

Delete the words "as agent" to reflect agreement between CPRL and the Power Agency.

Delete the words "and Attachment 1

to this license. Attachment 1 to this license is hereby incorporated into this license." Also, delete Attachment 1 and renumber the subsequent attachments.

Refer to letters dated December 19 and 29, 1986 from R. A. Watson (CPRL) to Dr. 3. Nelson Grace (NRC) for justification.

2.D Revise the indented paragraph to read:

"Shearon Harris Nuclear Power Plant, Unit 1, is exempt from the requirement of 10 CFR 50, Appendix E, Section IV.FI for the conduct of an offsite full participation exercise within 1 year before issuance of the first operating license for full power and operation above 596 of rated power, provided that a fullparticipation exercise is conducted before or during March 1987."

Also, delete the last paragraph of this section.

2.G Correct typographical error on the next to the last line. Change "with" to "within".

0 of Item 6 of Attachment 3 Add the following after Item 6.1:

"For Items f through 1 above, the licensee willmeet the cited requirement or willperform a site-specific analysis and willobtain concurrence from the TDI Owners Group's technical representative/

consultant for any deviations."

This willproperly reflect the intentions of the above-referenced license conditions.

(5113GAS/bmc)

Qf t ) \\