Suppls Util Re on-shift Operating Experience. E Brooks Successfully Completed Requalification Exam & Will Resume Duties.Barmann,Brooks,Garner & Kyser Will Man Four Different Shifts,Per Generic Ltr 84-16
ML18004B676
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/07/1987
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
GL-84-16, NLS-87-009, NLS-87-9, NUDOCS 8701140247
Download: ML18004B676 (4)


Text

ACCESSION NBR:

FAC IL:50'-'400 AUTH. NAllE CUTTER> A. B.

RECIP. NANE DENTONi H. R.

REG 0 'NFORNATION DISTR IBU N

STEN

<R IDS) 8701140247 DOC. DATE: 87/01/07 NOTARIZED:

NO DOCKET ¹ Sheav on Harv is Nuclear Power Planti Unit iR Cav olina 05000400 AUTHOR AFFILIATION Carolina Powev't Light Co.

RECIPIENT'FFILIATION Office of Nucleav'eactov Regulationi Director (post 851125 SUB JECT:

Suppls util 861231 ltv v e on-shift operating expev i ence.

E Bv'ooks successfu)lg completed v equali fication exam 8c will v esume duties. Barmann> Bv ooksi Gavner 8c Kisser will man fouv diffev'ent shifts. per Generic Ltr 84-16.

jl DISTRIBUTION CODE:

NOOSD COPIES RECEIVED: LTR / ENCL 0 SIZE:

1 TITLE: Qpevatov'equalification Progvam NOTES:Application for permit renewal filed.

05000400 REClr IENT ID CODE/MANE PMR-A PD2 LA BUCKLEY B COPIES LTTR ENCL REC l'P IENT ID CODE/NANE PWR-A PD2 PD COP IES LTTR ENCL INTERNAL: ACRS 8

H G

EXTERNAL: LPDR NSIC 08 FIB 04 03 05

'10 1

1 AEOD/PTB NRR/DHFT/NTB RGN2 NRC PDR 02 L

" TOTAL NUNBER OF COPIES REQUIRED:

LTTR 21 ENCL

M I',t A

,llew>>",

I

, ~

Sh~hCC l,i

'lit 'ht I II

/<<h>he Ctlf C

C,,

I, (hhh t'ttC, t'C,'i.

C I

'll c

l <<l ll" fhi

),'l iC I >>

I tt It, ~

C Cy Cf)

<<1 a,"1',l <<'!

C<< tg C'C.

'h'"'<<Cta" CtcC l) 'g,"J, %1 C

0 )t,l;,0

,.>>'I')

C Pi >>

~

1'll g ~

t

)I'I C'$ I

. I IL+

gR C

l, AQCl II, h

I

<<)fat I "g

'l, th

~

CMH, Carolina Power 8 Light Company SERIAL:

NLS-8 7-009 January 7,

198 7 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-53 ON-SHIFT OPERATING EXPERIENCE

Dear Mr. Denton:

This letter supplements our December 31, 1986 letter on this subjects Mr. E. Brooks has successfully completed his annual requalification written examination and will resume his shift duties'rs D. Batton is currently recovering from a successful thyroid operation.

In the interim, CP&L will operate with four qualified shifts, rotating on a 12-hour shift basis.

The experienced operators on each shift, who fully meet the requirements of Generic Letter 84-16, are:

Barmann (Senior Control Operator)

Brooks (Shift Foreman)

Garner (Shift Foreman)

Kyser (Shift Foreman)

This four-shift rotation also meets the requirements regarding number of hours to be worked by each shift during each week. If you have any questions on this subject or require additional information, please contact me.

Yours very truly, A. B C

er Vice President Nuclear Engineering

& Licensing ABC/SRZ/crs (SRZ-31) cc:

Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. J. Nelson Grace (NRC-RII) 87011>DOC< p5p 00400 g40+47 870107 pDR A

PDR 411 Fayettevitte Street

~ P. O. Box 1551 o Raleigh, N. C. 27602 ggb5

t ~

t o

~ ~