Text
ACCESSION NBR: 86 12300370 DOC. DATE: 86/12/19 NOTARIZED:
NO DOCKET 0 FACIL:50-400 Sheav on Harv is Nuclear Power Planti Unit ji Carolina 05000400 AUTH.'ANE AUTHOR AFFILIATION ZINNERNAN>S. R.
Carolina Pouter Zc Light Co.
RECIP. NANE RECIPIENT AFFILIATION DENTON> H. R.
Office of Nucleav Reactov Regulation.
Div ec tor (p ost 851125
SUBJECT:
Fortoards Data Sheet
- 10. 9 from Rev 1 to pv eopev ational test proceduv'e 1-8010-P-04 re integrated leak rate test v'esults at plant.
DISTRIBUTION CODE:
B001D COPIES RECEIVED: LTR ENCL SI ZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts 5 Related Correspondence NOTES: Application for permit v eneu!al +iled.
05000400 RECIPIENT ID CODE/NANE PWR-A EB PWR-A FOB PWR-A PD2 PD PWR-A PSB INTERNAL ACRS 41 ELD/HDS1 IE/DEPER/EPB 36 NRR BWR ADTS
.L REQ F LE IB EXTERNAL: BNL(ANDTB ONLY)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
1 1
1 1
1 1
6 1
0 1
1 0
1 1
1 1
0 1
1 1
1 1
RECIPIENT ID CODE/MANE PWR-A EICSB PWR-A PD2 LA BUCKLEY'S B 01 PWR-A RSB ADN/LFNB IE FILE IE/DGAVT/GAB 21 NRR PWR-B ADTS NRR/DHFT/NTB RQN2 DNH/DSS (ANDTS)
NRC PDR 02 PNL CRUELER COPIES LTTR ENCL 2
2 1
1 2
2 1
0 1
1 1
1 1
0 1
1 3
3 TOTAL NUNBER OF COPIES REQUIRED'TTR 36 ENCL 31
I M>qt.
I>v>,4 ML I.k',
>fq hr LII 5." Lk>
q
~r Jl;
>M h
f >/ >'(L l;
MS>> ',
'I
~
I>
>, )MK
~ v' J
L (M(> .I h
v'tlL Mh I "<<4 v
I CI 4$
I' k
k
(~q 'I L)
I',
> 'i
q
(
~
L K
LK(
~>
Jf>
F
~
q M
bk h1$ P/
->IL
'I q IL~
L I
v L L f
M h
I.,
kq F, II M
v IK I L q
,,kh,'
t; Mh' C>fi@
k~
q '3 M
fv
- ggQg, Carolina Power & Light Company SERIAL: NLS-86-070 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-000/LICENSE NO. NPF-53 INTEGRATED LEAK RATE TEST ADJUSTMENT
Dear Mr. Denton:
Carolina Power R Light Company (CPRL) hereby submits additional information concerning an adjustment to the integrated leak rate test (ILRT)results at the Shearon Harris Nuclear Power Plant (SHNPP). After the completion of the preoperational ILRT, a modification to a containment mechanical penetration (M-83) was required, and subsequently an adjustment to the ILRT results was performed.
This letter transmits the adjustment to the original results for the preoperational ILRT which were submitted by letter dated June 18, 1986.
The change to the containment mechanical penetration involved removing the blank plates from both sides of spare mechanical penetration M-83 and installing a penetration module containing two one-inch pipes.
Four containment isolation valves were also added.
These modifications required a 10CFR50, Appendix J Leak Test on the penetration sleeve welds and the containment isolation valves.
These tests were performed on September 22, 1986 per preoperational test procedure 1-8010-P-00, Revision l. The results of this testing were used to adjust the ILRT results as documented on the attached data sheet from the preoperational test procedure 1-8010-P-00, Revision 1. The Mass Point Leak Rate at the upper confidence interval, after this adjustment, is 0.05203 weight percent per day. This is less than the allowable leak rate of 0.075 weight percent per day.
If you have any questions on this subject or require additional information, please contact me at (919) 836-6202.
Yours very truly, 8612300370 Bg1P19 PDR ADaCK 0SO00OO0 P
PDR JHF/kts (5092 JDK)
Attachment S.. Zim rman er Nuclear Licensing Section cc:
Mr. B. C. Buckley (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Dr. J. Nelson Grace (NRC-RII) 411 Fayettevilte Street
~ P. O. Box 1551
~ Raleigh, N. C. 27602 p
gyt
v ~
~ g
~ ~
~+i Proc do. 1"8010-P-04 Issue:
Rev.
1 TCN-2 ALL Data Sheet 10.9 Calculation of Adjusted ILRT Results l.
Extract the following from Data Sheets 10.4 thru 10.8 of this procedure and add:
Penetration M-83 sleeve total leak rate Penetration M-83A total leak rate Penetration M-83B total leak rate SCCM SCCM SCCM
~
TOTAL (1) =
SCCM 2 ~
Convert (1) to weight X per day:
= (1) (0.05085)(0.07490)(100) 643200
, Pd083'V weight X per day = (2) 3.
Transfer total ILRT leak rate from Pre-Operational Test Procedure 1-80)O-P-03, Final Report Section 3.3, Mass Poin't Method, Upper Confidence Limit = 0.05199 w X
/day Add (2) to 0.05199 ddOC Q 7
+
0.05199
, ONQV+
=
Total adjusted Type A leakage 4.
Compare (3) to 0.075 weight X
~ 8 5 2 08 0.075 weight
)
Prepared by Date
'lo
~ g
~4