ML18004B621

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-79 on 860929-1003,15-17 & 27- 28.No Violations or Deviations Noted
ML18004B621
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/25/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004B622 List:
References
NUDOCS 8612030659
Download: ML18004B621 (4)


See also: IR 05000400/1986079

Text

HOV 85

1986

Docket No. 50-400

License

No.

CPPR-158

C

olina Power and Light Company

~

~

~

~

~

~

TN:

Mr. E. E. Utley

Senior

Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT

NO. 50-400/86-79

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

P.

G. Stoddart

on September

29 - October 3,

1986,

October 15-17,

1986,

and

on

October

27-28,

1986.

The inspection

included

a review of activities authorized

~

~

~

~

~

~

~

for your Shearon

Harris facility.

At the conclusion of the inspection,

the

findings

were

discussed

with those

members

of your staff identified in the

enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

In accordance

with Section 2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter

and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

Enclosure:

Inspection

Report

cc w/encl:

(See

page 2)

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

gbli2>

e~z

WgOCV ~

PgR

<~ggp&89

>pppg00'QR

6

~ao/

Carolina

Power and Light Company

cc w/encl:

~ A. Watson,

Vice President

Harris Nuclear Project

P. L. Tibbitts, Director of Regulatory

Compliance

M L. Willis, Plant General

Manager

b c w/encl:

Barth,

OGC

hf

Moore,

OGC

d4RC Resident

Inspector

Document Control

Desk

State of North Carolina

RII

PStod art:er

10$ g/86

DMCollins

14//] /86

RII

PFr dr ckson

lf/P /86

l

~ t'

W

ff

I

ll

g

~K

)

N

0