ML18004B616

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-75 on 860915-19.No Violations or Deviations Noted
ML18004B616
Person / Time
Site: Harris 
Issue date: 10/06/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004B617 List:
References
NUDOCS 8611260375
Download: ML18004B616 (3)


See also: IR 05000400/1986075

Text

Oe

OAysna/

'

Docket No. 50-400

License

No.

CPPR-158

Carolina

Power and Light Company

~

~

ATTN:

Mr .

E.

E. Utley

Senior

Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-400/86-75

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

L. Troup

on

September

15-19,

1986.

The

inspection

included

a

review of

activities

authorized

for your Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with

those

members

of your staff

identified in the enclosed

inspection report.

~

~

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a

copy of this letter

and its enclosure

contains will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc w/encls:

(See

page

2)

a~

3

~

sooo~oo

assoo6

@gal

  • DOCH, 05

8

<c~<

p

t

C

Carolina

Power

and Light Company

cc w/encl:

~R.

A. Matson,

Yice President

Harris Nuclear Project

/ D.

L. Tibbitts, Director of Regulatory

~ Compliance

<J.

L. Millis, Plant General

Manager

bcc w/encl:

gC/ Barth,

OGC

~.

Moore,

OGC

QRC Resident

Inspector

Document Control

Desk

State of North Carolina

RII

RII

GT:him

C ose

l9>/ >/86

i5/y/86

eNQ

DCollins

Q/2l86

RI I

PFredrickson

gY~/86