ML18004B608
| ML18004B608 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/17/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18004B609 | List: |
| References | |
| NUDOCS 8611250422 | |
| Download: ML18004B608 (3) | |
See also: IR 05000400/1986080
Text
Ng'It g7 $86
Carolina
Power
and Light Company
ATTN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NO. 50-400/86-80)
This refers
to the
Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
G.
F. Maxwell
on
September
20 - October 20,
1986.
The
inspection
included
a
review of activities
authorized
for your Harris facility.
At the conclusion
of the inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
The
inspection
findings indicate
that certain activities
appeared
to violate
NRC requirements.
The violation, with references
to pertinent
requirements,
and elements
to be included in your response
are described
in the enclosed
Notice
of Violation.
Your attention
is invited to
an
unresolved
item identified in the inspection
report.
This matter will be pursued during future inspections.
In accordance
with Section
2.790
of the
NRC's
"Rules of Practice,"
Part
2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosures
will be placed in the
NRC Public Document
Room.
The
responses
directed
by this letter and its enclosures
are
not. subject to the
clearance
procedures
of the Office of Management
and
Budget
as required
by the
Paperwork Reduction
Act, of 1980,
PL 96-511.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Original Signed
by
Luis A. Reyes
/for
Roger
D. Walker, Director
Division of Reactor Projects
Enclosures:
(See
page
2)
8bii250422 861117
ADOCK 05000400
6
Carolina
Power and Light Company
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
R. A. Matson,
Vice President
Harris Nuclear Project
. D.
L. Tibbitts, Director of Regulatory
J
Compliance
J.
L. Willis, Plant General
Manager
cc w/encls:
/
. Barth,
. Moore,
NRC Resident
Inspector
Document Control
Desk
State of North Carolina
RII
RLa
- lb
/
6
11/g /86
RlI
OVer rel 1 i
11/] q/86