ML18004B605

From kanterella
Jump to navigation Jump to search
Opposes Util Request for Exemption from Requirement to Test Plant Emergency Evacuation Plan within 1 Yr.Util Should Be Compelled to Conduct Full Participation Emergency Exercise of Replacement Plan Prior to Plant Operation
ML18004B605
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/05/1986
From: Helmer G
AFFILIATION NOT ASSIGNED
To: Zech L
NRC COMMISSION (OCM)
Shared Package
ML18004B602 List:
References
NUDOCS 8611210228
Download: ML18004B605 (2)


Text

L August 5, 1986 3508 Lexham Court Ap'ex, N.

C.

27502 Commissioner Lando Zech U.S. Nuclear Regulatory Commission 1717 H Street, N.W.

Washington, D.C.

20555 Dear Commissioner Zech:

It is my opinion that the Shearon Harris Emergency Evacuation Plan is of critical importance to all North Carolina residents who may be affected by the evacuation provisions of the plan.

We particularly are affected because our home is within the 10-mile radius of the plant.

Because of the importance of this plan in assuring our safety should an evacuation be necessary, we ur e

ou to den the re uest b

Carolina Power

& Li ht or an exem tion rom t e requirement o

We request that the NRC Participation Emergency before operation of the testing t at p an t is year.

compel CP&L to conduct a Full Exercise of the Replacement Plan Shearon Harris Plant is authorized.

We thank you in advance for your consideration of this very important matter.

rgi elmer Mr. Harold Denton Rep. Morris Udall Rep.

Edward Markey Rep.

Claudine Schneider Rep. Bill Cobey Rep.

Tim Valentine Rep.

John Dingell Sen.

Jesse Helms LSen. Jim Broyhill 8611210228 861118

@DR

  • DOCK 05000400 t

PDR

c.

~$'

J J

p t P,