Forwards Enforcement Conference Insp Rept 50-400/86-84 on 860825-28.Rept Addresses Root Cause & Generic Applicability of Failure of QA Program to Identify All Electrical Separation Deficiencies
ML18004B567
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/30/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18004B568 List:
References
NUDOCS 8611040191
Download: ML18004B567 (4)


See also: IR 05000400/1986084

Text

Docket No. 50-400

License

No.

CPPR-158

Caroling Power and Light Company

ATTN:~r. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/86-84

r

As

a result of the

NRC inspection

(50-400/86-62)

conducted

July 7-25,

1986,

an

unresolved

item (86-62-01)

was identified to you at the exit interview.

The unresolved

item involved the failure of the quality assurance

program to

identify all electrical

separation

deficiencies.

Subsequently,

the unresolved

item was

upgraded

to

a violation as

a result of the

NRC inspection

conducted

on August 25-28,

1986,

and identified to you in

NRC report 50'-400/86-66

dated

October

10,

1986.

~

~

~

~

~

~

~

~

Meetings

were

held with

CPIjIL on

August 29

and

September

25,

1986,

in the

Region II office to discuss

the root cause

and possible

generic applicability

to other construction activities at the

Shearon

Harris Plant.

NRC concerns

relative to the inspection

findings were discussed

with you and your staff in

an Enforcement

Conference

held on October 9, 1986.

A summary of the Enforcement

Conference

is documented

in the enclosed

Inspection

Report (50-400/86-84).

Sincerely,

Enclosure:

Inspection Report

No. 50-400/86-84

(Enforcement

Conference

Summary)

~

~

~

~

~

~

~

~

c

w/encl:

. A. Watson,

Vice President

Harris Nuclear Project

M. L. Tibbitts, Director of Regulatory

/ Compliance

V'J. L. Willis, Plant General

Manager

bcc w/encl:

(See

page

2)

J.

Nelson Grace

Regional Administrator

"861'10401'F1

861030

PDR

ADOCK 05000400

..'G

..

PDR

~

~

i f

t

Carolina

Power and Light Company

cc w/encl:

CZ Barth,

OGC

~. Moore,

OGC

RC Resident

Inspector

/tate of North Carolina

vA. Gibson

Q. Walker

J~.

R. Herdt

. Verrelli

. E. Conlon

g.

Fr edri ckson

+

. Jenkins

. Mong, IE

Document Control

Desk

2

1

OCT ~ O 1986

RIIt

TEConlon:ls

10/g+/86

RILE

RI I

ARHerdt

VP

10'/86

RII

ec'era

0Yerre111

86

10/

/86

8

RI IQ~

I I

Walker

GJenk

ns

M

nst

10/~/86

10/

/86

/

/86

0

t

I

li

V

II

I'

U

~

1