ML18004B564

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-82 on 861006-10.No Violations or Deviations Noted
ML18004B564
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/23/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004B565 List:
References
NUDOCS 8611030354
Download: ML18004B564 (4)


See also: IR 05000400/1986082

Text

QGT 33

1986

Docket No. 50-400

License

No.

CPPR-158

C

olina Power

and Light Company

~

~

~

~

~

~

TN:

Nr. E. E. Utley

Senior Executive Yice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/86-82

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G. L. Troup

on October 6-10,

1986.

The inspection

included

a review of activi-

ties

authorized

for your Shearon

Harris facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

~

~

~

~

~

~

~

~

~

~

~

~

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of se1ective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

Enclosure:

Inspection

Report

cc w/encl:

(See

page

2)

David H. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

8611030354

861023

PDR

  • DOCK 05000400,

PDR

~,

p,

'

dl fl

J

t

q

Carol~ Power and Light Company

cc w/encl:

~ A. Watson,

Vice President

Harris Nuclear Project

~. L. Tibbitts, Director of Regulatory

Compliance

8 L. Willis, Plant General

Manager

bcc w/encl:

C. Barth,

OGC

N. Moore,

OGC

ARC Resident

Inspector

Document Control

Desk

State of North Carolina

RII~

Troup:er

10/@/86

RII~

hoeey

10/A(86

<<)bs<

DCollins

10/Z+86

Fredr~

kson

10/a,+86

'

N

it

k

e

h

o'(

II