ML18004A608

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-70 on 860915-19.No Violations or Deviations Identified
ML18004A608
Person / Time
Site: Harris 
Issue date: 10/16/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004A609 List:
References
NUDOCS 8610210348
Download: ML18004A608 (4)


See also: IR 05000400/1986070

Text

y~//uN

OCT'1 6

1986

Docket No. 50-400

License

No.

CPPR-158

Carolina

Po er and Light Company

ATTN:

. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/86-70

This refers

to the Nuclear

Regulatory

Comoission

(NRC) inspection

conducted

by

A. R.

Long

on

September

15 - 19,

1986.

The inspection

included

a review of

activities authorized for your Shearon

Harris facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

~

~

~

~

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter

and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact

us.

Sincerely,

Enclosure:

(See

page

2)

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

S6>Oa>0S4S

Brio~6

PDR

ADOCK 05000400.

8

PDR

~h

t

(5

P

"I ~

~ lf

)

)

I g

I

ill/

lit

I

h

f

il

lt

p

rljgii /

P

Ij'i, Ii

)

,tf

4

P

~ If "Pt

I ~

Ii((

I

~

t-\\ ~

fif II P

II

I

+ fi ii)

ll',

I!

~

P

"

P

I;fj(g)g

li

I'

h) II )a

ii

h

OCT I ~

fS86

Carolina

Power

and Light Company

Enclosure:

NRC Inspection

Report

/encl:

R. A. Watson,

Yice President

rris Nuclear Project

. L. Tibbitts, Director of Regulatory

Co pliance

. Willis, Plant General

Manager

, bgc w/encl:

'C. Barth,

OGC

moore,

OGC

C Resident

Inspector

ument Control

Desk

ate of North Carolina

RII

RII

10/ N /86

10/

/86

RII (pf

I

ARHerdt

q <

redrickson

10/lo /86

10/ J'l/86

)~i,<:t

'

~~'~

~'

II "

1

II

)

t

II

1

l

)p

~4

",'I

'"'l

L

W

fi

e ',I

][

~'P.

h

'h

P

y

f'i

II

!(

H