Submits Supplemental Info Addressing Adequacy of on-shift Operating Experience at Facility.Encl Provides Util Backup Shift Complement for Full Power Operation as Contingency
ML18004A605
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/16/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8610210229
Download: ML18004A605 (13)


Text

REGULA Y INFORNATIQN DISTRIBUTI(

SYSTEN (RIDS)

'e

~

ACCESSION NBR: 8610210229'OC.

DATE: 86/10/16 NOT*RXZED:

NQ DOCKET ¹ FAG IL: 50-400 Sheav on Hav v is Nucleav Power Plant>

Unit ii Cav olina 05000400 AUTH. NANE AUTHOR AFFXLXATIQN ZXPINERI'3AN. B. R.

Cav.olina Power Zc Light Co.

RECIP. NAl'lE RECIPIENT AFFILIATION DENTON> H. R.

Office of Nuclear Reactor Regulation>

Div ectov (post 851125

SUBJECT:

Submits supplemental info addv essing adequacy of on-shift opev'ating expev ience at facility. Enc) provides util backup shift complement fov full power oppev'ation as contingencg.

DISTRIBUTION CODE:

N003D COPIES RECEIVED: LTR ENCL SIZE:

TITLE:

Qp ev atov'equal ification Program NOTES: Application for pevmit v eneeal filed.

05000400 RECIPIENT ID CODE/NAI'1E PNR-A PD2 LA gUCKLEYi9 COPIES LTTR ENCL 1

0 RECIPIENT ID CODE/NANE PMR-A PD2 PD COPIES LTTR ENCL 1

1 INTERNAL: AEOD/PTB NRR/DHFT/NTB RCN2 1

1 1

NR

/HFIB IL 04 EXTERNAL:

LPDR NBXC 03 05 NRC PDR 02 TOTAL NUNBER OF COPIEB REQUIRED:

LTTR 11 ENCL 10

h a

I

>> t d

l

[i

XQCt Carolina Power & Light Company October 16, 1986 Hr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington DC 20555 SHEARON HARRIS NUCLEAR PONER PLANT UNIT NO.

1 " DOCKET NO. 50-400 ON SHIFT OPERATING E)(PER I ENCE

Dear Hr. Denton:

Carolina Power 5 Light Company (CPhL) hereby submits supplemental information addressing the adequacy of on shift operating experience at the Shearon Harris Nuclear Power Plant (SHNPP).

Based on discussions with your staff, CPhL has initiated actions to qualify an additional person (Hr.

K. Kyser) with six months hot operating experience.

Hr. Kyser has had 4 '

months of hot experience at the CPhL H.

B. Robinson Steam Electric Plant (HBR) and is returning to HBR on October 20, i98b to work on shift to accumulate an additional 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> of hot shift experience.

htr. Kyser will then be available as a backup to provide on shift experience for power levels greater than 5 percent of full power.

htr. Kyser's resume is attached as Attachment 3.

CPhL will also utilize Nr ~

H. Smith as a backup to provide on shift operating experience.

hlr.

H. Smith has had extensive hot experience at HBR as well as classroom and simulator training at SHNPP.

Nr. Smith's resume is in the Final Safety Analysis Report (FSAR) on page's i3.i.3-32 and 33.

Attachment I shows CPhL's preferred shift experience complement for full power operation.

Attachment 2 provides CP5L's backup shift complement for full power operation as a contingency to provide the necessary experience on shift.

If you have any questions or require additional information on this subject, please contact me.

Yours very truly, S.

R.

2i erman hlanager Nuclear Licensing Section Attachments cc:

hlr.

B.

C.

Buckley (NRC)

Nr ~

G.

F. )taxwell (NRC-SHNPP) hlr.

J

~ Nelson Grace (NRC-RII)

E)bi0210229 861016 PDR ADOCK 05000400 PDR 411 Fayetteville Street

~ P. 0. Box 1551

~ Raleigh, N. C. 27602

ATTACHHENT 1

Shift Foreman E.

Brooks R ~ Garner D. Batton""

C. Briney C.

matthews License - Nonths SRO - 48 SRO -

12 SRO " 60 SRO -

41 SRO 14 Experi ence" On Shift sel f sel f sel f H. Carter N, Barmann""

License - Nonths RO " 4.5 RO -

12

'. llyser and H.

Smith would be available and used as backup as necessary.

"" D. Batton and W.

Barmann are currently in training and are scheduled for simulator exams the week of November 3,

1986.

ATTACHMENT 2 Shift Foreman License Months Experience Qn Shift License Months ED Brooks R.

Garner C. Briney C.

Matthews H, Carter SRO - 48 SRO "

12 SRO " 41 SRO -

14 RO - 4.5 self sel f K. Kyser J.

Abraham" H. Smith SRO/RO " 6 SRO/RO -

6 SRO " 72

" J.

Abraham will be sent to HBR for an additional 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> of hot experience prior to being utilized for experience on shift.

Should this situation arise (as a result of simulator examinations),

CPhL would run 4

shift coverage (the first 4 listed with Carter substituting for Abraham) until J

~

Abraham has accumulated 6 months hot experience upon which time 5 shift rotation would resume.

Mr. Abraham's resume is attached as Attachment 4.

ATTACHMENT Kenneth K.

K ser 9 years 9 months, Eb Nuclear Electricians Mate

+

i year, Asst. Shiit Test Engineer on Reactor Systems at Ingalis Shipyard

years, Auxi 1 iary Qperator at HBR August i982, 1 icensed as RQ at HBR 4.5 months as licensed RQ at HBR late i982 early 198' 20 percent power At SHNPP from August 1982 to present except for 4. 5 months at HBR Licensed as SRQ SHNPP July 24,1986 September 27, 1986, promoted to Shift Foreman

RESUME KENNETH K. KYSER SHIFT FOREMAN Birthdate:

July 25, 1948 Education and Trainin Norwin High School, North Huntingdon, PA - 1966 Electrician Mate "A" School Basic Electricity and Electronics Nuclear Power School Prototype Training Motor-Generator School Professional Affiliations and Achievementss None Ex erience Prior to Joinin CP&L:

t 06/66 - 12/66:

Ventura Dodge, North Huntingdon, PA - Automobile Mechanic 02/67 - 06/68:

Greene Motor Equipment Company, Geeensburg, PA - Parts Clerk 07/68 - 04/78' S ~ Navy - Electrician's Mate 05/78 - 04/79:

Ingall's Shipyard, Pascagoula, MS - Assistant Test Engineer Ex erience With CP&L:

05/21/79:

Employed as an Auxiliary Operator A in the Nuclear Generation Section of the Generation Department.

(Temporarily assigned to the H ~

B ~ Robinson Plant, Hartsvi lie, SC) 08/28/82:

Transferred as an Auxiliary Operator A to the Nuclear Operations Department at the Harris Plant.

09/18/82:

Promoted to Control Operator in the Nuclear Operations Department at the Harris Plant.

09/03/83:

12/22t84:

h 04/26/86:

Reorganization

- Department renamed Narris NucLear ProJect.

Promoted to Senior Control Operator - in training in the Plant Operations i)nit, Harris Plant Section of the llarris Nuclear ProJect Department

~

Promoted to Senior Control Opera tor in the Plant Operations Uni t, Harris Plant Section of the lfarris Nuclear ProJect Department.

09/27/86:

Promoted to Shift Foreman

ATTACHMENT 4 James D. Abraham

+

9 years, Nuclear Machinist Mate ERS Qualilied 2 yeal s y ALLY,iliar y Oper atol at HBR August 1982, licensed as RO at HBR 4.5 months as licensed RO at HBR late 1982 early 198~

> 20 percent power At SHNPP from August 1982 to present e>;cept

%or 4.5 months at HBR Licensed as SRO SHNPP July 24,1986

RESUME JAMES D ~

ABRAHAM SENIOR CONTROL OPERATOR Birthdate:

August 23, 1952 Education and Trainin:

Northwestern State University, Natchitoches, LA -'Mechanical Drawing - 1970 U.

S ~ Navy - Machinist Mate "A" School and Nuclear Power School - 1972 U. S.

Navy - Nuclear Power Training Unit - 1973 U.

ST Navy - Instructor Training - 1978 Lamar University, Beaumont, TX - Air Conditioning and Refrigeration Professional Affiliations and Achievements:

American Nuclear Society Ex erience Prior to Joinin CP&L:

01/69 - 06/71:

Brookshires Grocery, Natchitoches, LA - Produce Clerk 08/71 - 08/80:

U.

S Navy Ex erience Mith CP&L:

09/02/80:

Employed as an Auxiliary Operator A in the Nuclear Operations Department of the Harris Plant Section.

(Temporarily assigned to the H. B. Robinson Plant, Hartsvi lie, SC.)

08/28/82:

Transferred as an Auxiliary Operator A to the Nuclear Operations Department located at the Harris Plant.

09/18/82:

Promoted to Control Operator in the Nuclear Operations Department located at the Harris Plant.

09/03/83:

Reorganization - Department renamed Harris Nuclear Project.

02/16/85:

Promoted to Senior Control Operator - in training in the Plant Operations Unit, Harris Plant Section of the Harris Nuclear Project Depa rtmen t.

James D. hbraha Page 2

04/26/86: