Responds to NRC Request That Accuracy of Facility Tech Specs Be Confirmed.Tech Spec Accuracy Established Through Extensive & Integrated Development Process Involving Reviews by Util,Nrc,Ebasco & Westinghouse.All Conflicts Resolved
ML18004A600
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/06/1986
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-86-215, NUDOCS 8610210056
Download: ML18004A600 (6)


Text

c>.

REGULA Y INFQRNATION DISTR IBUTI YSTEN (R IDS)

ACCESSION NBR: 8610210056 DOC. DATE: 86/10/06 NOTARIZED: YES DOCKET FACIL: 50-400 Sheav on Hav ris Nucleav Powev Plant> Unit 1. Cav olina 05000400 AUTH.'NANE AUTHOR AFF ILlATION UTLEY> E. E. Cav olina Powev'c Light Co.

RECIP. NANE RECIPIENT AFFILIATION DENTONp H. R. OFfice oF Nuclear Reactov Regulation~ Div ectov'post 851125

SUBJECT:

Responds to NRC request that accuracy oF Facility Tech Specs be conf iv med. Tech Spec accuv acg estab l i shed thv'ough ex tensi ve wc integv'ated d eve I opmen t proc ess lnvolvin g revi ews bg util. NRC. Ebasco Westinghouse. *II conFlicts. v esolved.

Cc DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL . SIZE:

TITLE: Licensing Submittal: PSAR/FSAR *mdts Zc Related Correspondence NOTES: Application Nor pev mit v enewal +1 led. 05000400 REC IP IENT COPIES REClP I ENT COP IES ID CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL PWR-A EB PWR-* EICSB PWR-A FOB PWR-* PD2 LA 1 PWR-A PD2 PD BUCKLEY> B 01 2 PWR-A PSB PWR-A RSB 1 INTERNAL: ADN/LFNB 1 ELD/HDS1 1 IE FILE 1 IE/DEPER/EPB 36 IE/D('AVT/GAB 21 1 NRR BWR ADTS NRR PWR-B ADTS NRR RO L 1.

NRR/DHFT/NTB 1 I 04 1 RCN2 3 Nl /Nl8 1 EXTERNAL BNL(ANDTS ONLY) DNB/DSS (ANDTS)

LPDR 03 NRC PDR 02 NSIC 05 PNL GRUEL>R TOTAL NUBBER OF COPIES REQUIRED: LTTR 30 ENCL

f I

H P

("

T',

k p'i I i'1 I

CANtK Carolina Power 8 Light Company P. O. Box 1551 ~ Raleigh, N. C. 27602 SERIAL: NLS-86-215 igtg> 55~54 E. E. UTt.EY Senior Executive Vice President Power Supply and Engineering 5r Construction Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. I - DOCKET NO.50-000 TECHNICAL SPECIFICATION CERTIFICATION

REFERENCE:

1. Letter dated July 11, 1986 from Mr. Daniel G. McDonald (NRC) to Mr. E. E. Utley (CPRL).
2. Letter dated September 30, 1986 from Lester S. Rubenstein (NRC) to Mr. E. E. Utley (CPRL).
3. Letter dated September 25, 1986 (NLS-86-365) from Mr. S. R. Zimmerman (CPtt~:L) to Mr. H. R. Denton (NRC).
0. Letter dated September 29, 1986 (NLS-86-377) from Mr. S. R. Zimmerman (CPdcL) to Mr. H. R. Denton (NRC).

Dear Mr. Denton:

This letter responds to the NRC staff request that Carolina Power R Light Company (CPRL) attest to the accuracy of the Shearon Harris Nuclear Power Plant (SHNPP)

Technical Specifications.

The accuracy of the SHNPP Technical Specifications has been established through an extensive and integrated development process. This process has involved reviews by CPRL, NRC, Ebasco, and Westinghouse personnel. The SHNPP Technical Specifications include the Final Draft Technical Specifications transmitted to CPRL by Reference 1; the changed pages transmitted by Reference 2; and the incorporation of comments provided by References 3 and 0.

8b1021008b 8blopb PDR ADQC< pgpppppp PDR'

1 P

  • W *\ '

II I

Mr. Harold R. Denton NLS-86-215 / Page 2 To the best of our knowledge, the SHNPP Technical Specifications accurately reflect the as-built plant and the current SHNPP FSAR, as supplemented by docketed letters.

Furthermore, we are not aware of any conflicts, other than those previously identified, between the SHNPP Technical Specifications and the NRC staff's SER analyses. Based on discussions With the staff 'during the Technical Specification development process, it is our understanding that the ideritified conflicts have been resolved.

Yours very truly, E. E. Utley GAS/crs (3967GAS) cc: Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. 3. Nelson Grace (NRC-Rll)

E. E. Utley, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 2 Light Company.

Notary (Seal)

My commission expires: g/pg/g "j