REGULA Y INFQRNATION DISTR IBUT10

'SYSTEI'l (R IDS)

ACCESSION NBR: 860929'0335 DQC. DATE: 86/09/i8 NOTARIZED:

NQ DOCKET 0 FACIL: 50-400 Sheav on Hav v is Nuclear Powev Plant>

Unit i> Car ol ina 05000400 AUTH. NAt'lE AUTHOR AFF1'LIATION ZINl'tERNAN>S. R.

Carolina Powev 8c Light Co.

RECIP. NANE, RECIPIENT AFFILIATION DENTQN> H. R OFFi ce of'ucleav Reactor Regulation.

Div ec tov (post 85ii25 SUB JECT:

Submits addi clav'i fging info v'e util 8609ii ltv'oncerning TDI diesel generatov s> per request at 8609i6 meeting.

DISTRIBUTION CODE:

BOBID COPIEB RECEIVED: LTR g ENCL 0 BI IE:

TITLE:

Tv ansamev ica Delaval>

Inc.

(TDI

) Diesel Generatov Owners Group NOTES: Application For pev'mit renewal Filed.

05000400 RECIPIENT ID CODE/Nhl'tE PWR-A ADTS PWR-A EICSB PWR-A PD2 LA BUCKLEY>B Oi PWR-A RSB INTERNAL: ADN/LFl'lB ASLAP ELD/HDSi IE KIESSEL, D NRR PERSI NKQ NRR SHAW,H NRR TONLINSON> E NRR WRIGHT, R NRR/ORAS NURPHY PA RGN2 COPIES LTTR ENCL i

2 RECIP IENT ID CODE/NANE PWR-A EB PWR-A FOB PWR-A PD2 PD PWR-A PSB AEOD CHIRANAL>N ASLBP GC NRR BERLINGER> C NRR SELLERS> D NRR SPANQ> A NRR TREH*N> N NRR/DSRQ/RSIB OP RON> D FIL 04.

COPIES LTTR ENCL EXTERNAL: LPDR NSIC 03 05 NRC PDR 02 TOTAL NUBBER OF COPIES REQUIRED:

LTTR 34 ENCL

fg

'l P

f, I

p I

I P

,N,q

CSCK Carolina Power 8 Light Company

$ EP

< 8 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SERIAL:

NLS-86-360 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.

1

DOCKET NO. 50-400 TRANSAMERICA DELAVAL, INC+ (TDI), DIESEL GENERATORS

Dear Mr. Denton:

A meeting was held on September 16, 1986, with members of your staff to discuss Carolina Power

& Light Company's (CP&L) submittal dated September 11, 1986 (NLS-86-239), concerning TDI diesel generators.

At the meeting, CP&L was requested to provide additional clarifying information.

The purpose of this letter is to provide this information.

Item 5b of Attachment 1 to the above letter states:

b.

Verify liner dimensions including bore, length, height, O.D., and shoulder height for all cylinder liners.

Carolina Power

& Light Company hereby provides the following clarifications to our previous position (additional clarification in quotes):

Liner dimensions (less length) were measured and found acceptable (overall length was not taken since requirement was imposed after machining of liners by TDI).

"The overall length is not a critical parameter for liner adequacy.

If the length was unacceptable, interference between the connecting rods and the liners would occur during operation.

The "A" engine cylinder liners were visually inspected after about 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> of site operation and found satisfactory.

Therefore, the length is satisfactory.

Additionally, as all 32 liners (both A and B engines) were reworked by TDI in the same time frame and sub)ected to CP&L QA shop inspections, obvious length discrepancies would have been noted."

Liner proudness measurements were obtained and found to be less than 0.0025 inches on the cylinders.

Item 9 of Attachment 1 to the above letter states:

As the "A" components were inspected and found acceptable, inspections of the "B" components was not required (page 1 of CQRC).

Carolina Power

& Light Company hereby provides the following clarifications to our previous position (additional clarification in quotes):

As the "A" components were inspected and found acceptable, inspections of the "B" components was not required (page 1 of CQRC).

"However, CF&L did perform a magnetic particle test on the rib area of all the "B" engine AE piston skirts."

'b09290335 860918

,. PDR ADOCK 05000400 i

'S "PDR 411 Fayettevilte Street

~ P. O. Box 1551

~ Raleigh, N. C. 27602

Mr. Harold R. Dent~

~ NLS-86-360

/

Pageos In addition to spectrographic

analysis, CP&L commits to perform ferrographic engine oil analysis on a quarterly basis.

Additionally, CP&L was requested to provide a rationale for the "blanks" in the Shearon Harris column in Part E of the TDI Owners'roup (OG) Maintenance and Surveillance (M&S) Program, Revision 2 submitted to the on June 5,

1986 (NLS-86-181).

This part of the OG M&S Program was developed to assist in applying the generic M&S Program to specific plant sites.

The Part E cover page defines that a "blank indicates that the utility is not required to perform the maintenance indicated".

The following provides the rationale for the blanks:

Component Barring Device Air Filter Barring Device Control Valve

& Pressure Regulator Reasoning Not installed at SHNPP Not installed at SHNPP Crankcase Vacuum Fan Not Installed at SHNPP Diesel Starting Air Compressors The blank should not exist as the component is installed.

This component is included in the SHNPP Program under a

specific maintenance surveillance test procedure which incorporates the applicable EOC inspections as shown on page II-C-27 of the OG M&S Program (SHNPP does not have filter felts).

Flywheel Bolting The SHNPP DR/QR Report (Volume 3, component 02-330B) states:

"There are no modifications or maintenance recommendations for this component."

Gear Train As a line item in Part E, only one utility (a V-20 engine) has an identified M&S recommendation.

This is because the M&S recommendations were addressed under the individual gear components when the OG issued Revision 2 of the M&S Program.

Hydraulic Valve Lifters The SHNPP engines have mechanical valve lifters.

Mr. Harold R. Dent NLS-86-360

/

Page~

The above information was discussed with your staff during the September 16, 1986, meeting and found acceptable.

Should you have any questions concerning this letter, please contact Mr. Patrick P. Carier at (919) 836-8165.

Yours very truly, PPC/mf (4098PPC)

S R.

mmerman nager Nuclear Licensing Section cc:

Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. J. Nelson Grace (NRC-RII)

~

~

~e