ML18004A493
| ML18004A493 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/25/1986 |
| From: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Whitley C HOUSE OF REP. |
| Shared Package | |
| ML18004A494 | List: |
| References | |
| NUDOCS 8608290157 | |
| Download: ML18004A493 (7) | |
Text
AUG as 586 The Honorable Charles 0. Whitley United States House of Representatives Washington, D.C.
20515 DISTRIBUTION EDO 2005 NRC PDR w/incoming Local PDR w/incoming EDO Reading Denton/Vollmer GCunningham PAD¹2 RF w/incoming OGC-Bethesda VStello PPAS w/incoming AJohnson BBuckley JGuillen DNiller SECY (3) (¹86-0757)
NGrace JTaylor CRossi d~
Dear Congressman Whitley:
I am pleased to respond to your letter dated July 29, 1986, which was addressed to Chairman Nunzio J. Palladino and referred to me for reply.
I appreciate your communicating the results of a resolution by the Town of Benson, North Carolina supporting the licensing of the Shearon Harris Nuclear Power Plant and indicating the benefit of the plant to Benson and the surrounding area.
The Nuclear Regulatory Commission staff is nearing completion of its review to ensure that the plant meets all appropriate safety, environmental, and design requirements.
Sincerely,
<~) T.h Sd Victor Stello, Jr.
Executive Director for Operations Retyped by CSchum, 8/19
- SEE PREVIOUS PAGE FOR CONCURRENCE LA'PAD¹2*
DNiller 08/19/86 D
R 1 er gp/86 b082'F01 5 8
7 PDR ADOCK H
PE:PAD¹2*
JGuillen 08/19/86 HD nl p /~l86 8b0825 05000400 PDR PN:PAD¹2*
BBuckley:hc 08/19/86 EDO VStello
/
/86 PD:PAD¹2 'D:DPLA LRubenstein TNovak 08/19/86 08/19/86
0 I
J Jg hl g gyH lv H
~ r sk ~
(
I
The Honorable Charles
- 0. Whitley United States House of Representatives Washington, D.C.
20515 Dear Congressman Whitley:
I am pleased to respond to your letter dated July 29, 1986, which was addressed to Chairman Nunzio J. Palladino and referred to me for reply.
I appreciate your communicating the results of a resoluti n by the Town of
- Benson, North Carolina supporting the licensing of the hearon Harris Nuclear Power Plant.
I can assure you that the Nuclear Regulat ry Commission staff will not cause any unreasonable delays in the licensj, g of the Shearon Harris 2
- Plant, as a result of our ongoing review to ensure ghat the plant meets all appropriate safety, environmental, and design reg frements.
If we can be of any assistance, please do not h sitate to contact us.
Sin erely, DISTRIBUTION NRC PDR w/cy of incoming Local PDR w/cy of incoming ED08 2005 EDO Reading H. Denton/R.
Vollmer C. Rossi PAD82 Rdg w/cy of incoming OGC-Bethesda V. Stello PPAS (ED082005) w/cy of incoming A. Johnson B. Buckley J. Guillen D. Miller Victor Stello, Jr.
Executive Director for Operations N. Grace J. Taylor G.
Cunningham SECY (3) (886-0757) 8/i /86 DD:NRR RVollmer 8/
/86
. AD82 uillen i) 8/)+86 D:NRR HDenton 8/
/86 Dg2 D82
>~BBuckley: hc LRu~nstein
~ '8/i+86 8~86 EDO VStello 8/
/86 Novak 8/Ip/86
I I
r W
/
Y
(
f
',E
~PR RECy I
P s?
0 Cn
+>>*++
e UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 FDO PRINCIPAL CORRFSPONDENCE CONTROL FROM:
REP ~
CHARLES 0.
WHITLEY TO:
CHAIRMAN DUE: 08/20/86 EDO CONTROL: 002005 DOC DT: 07/29/86 FINAL RFPLY:
FOR SIGNATURE OF:
EXECUTIVE DIRECTOR GREEN SFCY NO: 86-757 DESC:
BOARD OF COMMISSIONERS FOR TOMN OF BENSON, NC SUPPORTS LICENSING OF SHEARON HARRIS NUCLEAR PONER PLANT ROUTING:
GRACE TAYLOR GCUNNINGHAM DATE: 08/05/86 ASSIGNED TO:
NRR CONTACT:
DENTON SPECIAL INSTRUCTIONS OR REMARKS:
NRR RECEIVED:
08/O6/86 ACTION:
>'DPLA NOVAK NRR ROUTING:
DENTON/VOLLMER PPAS MOSSBURG/TOMS
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:
ACTION OFFICE AUTHOR'FFILIATION:
CRC-86-0757 EDO C.O. Whitley Cont Ref U.S.
HOUSE OF REPRESENTATIVES LOGGING DATE: Jul 21 86 LETTER DATE
SUBJECT:
ACTION:
DISTRIBUTION:
Jul 29 86 FILE CODE:
ID&R-5 Shearon Harris Supports the licening of the Shearon Harris nuc plant Appropriate OCA to Ack SPECIAL HANDLING: None NOTES:
DATE DUE:
SIGNATURE:
AFFILIATION:
DATE SIGNED:
Rec'd Off. EDO-~ sc
~ \\
~
~
r