ML18004A415

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-42 on 860603-06.No Violation or Deviation Noted
ML18004A415
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/14/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004A416 List:
References
RTR-NUREG-0800, RTR-NUREG-800 NUDOCS 8608110140
Download: ML18004A415 (4)


See also: IR 05000400/1986042

Text

JULY < 1986

Docket No. 50-400

License

No.

CPPR-158

C

olina Power

and Light Company

~

~

TTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-400/86-42

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

A. B. Ruff on June 3-6,

1986.

The inspection

included

a review of activities

authorized

for your

Shearon

Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with

those

members

of your

staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

e

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

In

accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

wi 11

be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor

Projects

Branch

2

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

8608110140

860714

PDR"

ADQCK 05000400

8

PDR

'I

A

~

~

d58J a L JUL

l'

'i

~

L

~

~

J

'h

\\

. 5

J'

I

~

>s

I,.

z,

I

.I

I

J

yt

t

., 'll'

'1

~

II

A

Carolina

Power and Light Company

JUL r < ass

~

~

c

w/encl:

. A. Matson,

Vice President

.Harris Nuclear Project

P'.

L. Tibbitts, Director. of Regulatory

Compliance

L. Willis, Plant General

Manager

)pc w/encl:

C

Barth,

ELD

4

Moore,

ELD

RC Resident

Inspector

Document Control

Desk

State of North Carolina

RII

ABZ&f:er

0~7//~ /86

II

RIIgg

PMMadden

07/IO/86

RII

RI

EConlon

AKerdt

0'7/fO/86

07/ii /86

ge

L

j3',)Pf @ k.>UL