Forwards Insp Rept 50-400/86-43 on 860609-13.No Violations or Deviations Noted
ML18004A337
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/15/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004A338 List:
References
NUDOCS 8607300129
Download: ML18004A337 (4)


See also: IR 05000400/1986043

Text

Docket No. 50-400

License

No.

CPPR-158

C rolina Power and Light Company

~

~

TTN:y Nr.

E.

E. Utley

Senior Executive Vice .President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/86-43

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

T.

R. Collins on June 9-13,

1986.

The inspection

included

a review of activities

authorized

for your

Shearon

Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within th'e

scope of the inspection,

no violations or deviations

were identified.

In

accordance

with Section

2.790

of the

NRC's

"Rules

of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a

copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

(See

page

2)

>~9 BEi0715

PDR

ADOCK OSOOOOOa

8

.

PDR

3E 0> 3L"

Carolina

Power

and Light Company

Enclosure:

NRC Inspection

Report

cy w/encl:

&. A. Watson,

Vice President

Harris Nuclear Project

. M. Parsons,

Project General

Manager

L. Tibbetts, Director of Regulatory

Compliance

L. Willis, Plant General

Manager

bcc w/encl:

+ Barth,

ELD

ad.

Moore,

ELD

AC Resident

Inspector

Document Control

Desk

State of North Carolina

B. Uryc

RII

TCoflins:bhg

'7//5 /86

RII

C osey

'P//p/86

RII

DCollins

F//g /86

6/

/86

7h>

'l

Fredri ckson,

ryc

/86

7//~186

7//s-

0