Text
e
JUL 2 3
1986
Docket No.:
50-400
Licensee
No.:
CPPR
158
Carolina
Power
and Light Company
ATTN:
Nr.
E.
E. Utley
-Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NO. 50-400/86-40
This refer s to the Nuclear
Regulatory
Commission
(NRC) inspection
conducted
by
N. Merriweather
on
Nay 19-23,
1986.
The
inspection
included
a
review
of
activities authorized for your Shearon
Harris facility. At the conclusion of the
inspection,
the
findings
were
discussed
with
those
members
of your staff
identified in the enclosed
inspection report.
t
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the scope of the inspection,
no violations or deviations
were identified.
Your attention
is invited to unresolved
items identified in the
inspection
report.
These matters will be pursued during future inspections.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a
copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
David M. Verrelli
Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosure:
(See
page
2)
t'6072V0PP8
8607>>
ADOCK 05000400
I~
r- '(
"8 JUi<
t
RII
RII
Herriweather:him
TConl
n
$/17/86
)/(g/86
JUL 2 3
1986
Carolina
Power and Light Company
Enclosure:
NRC Inspection
Report
cc w/encl:
W. A. Watson,
Vice President
Harris Nuclear Project
13. L. Tibbitts, Director of Regulatory
Compliance
JJ ~ Willis, Plant General
Manager
bcc w/encl:
C. Barth,
ELD
J.
Moore,
ELD
NRC Resident
Inspector
Document Control
Desk
State of North Carolina
RII
RII
TMerriweather:him
TConlon
6/
/86
6/
/86
RI I
AHerdt
6/
/86
C'\\
~
f
l
I