ML18003B257
| ML18003B257 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/14/1986 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18003B258 | List: |
| References | |
| NUDOCS 8605210048 | |
| Download: ML18003B257 (3) | |
See also: IR 05000400/1986028
Text
C rolina Power
and Light Company
TN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
May 14,
1986
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/86-28
On April 14-18,
1986,
NRC inspected
act,ivities authorized
by
NRC Construction
Permit
No.
CPPR-158
for
your
Harris facility.
At the
conclusion
of the
inspection,
the
findings
were
discussed
with
those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
( original signed by)
David M. Verrelli, Chief
Reactor
Projects
Branch
2
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/86-28
w/encl:
. A. Watson,
Vice President
Harris Nuclear Project
'fC.
M. Parsons,
Project General
Manager
~J.
L. Willis, Plant General
Manager
bcc w/encl:
(See
page
2)
8605210048
860514~1
PDR, ADOCK 05000400
6;
'DRI
I
I4
I
l'f
uvre
lt
Carolina
Power
and Light Company
May 14,
1986
bc~ w/encl:
Barth,
ELD
5~ Moore,
ELD
%RC Resident
Inspector
Document Control
Desk
State of North Carolina
RII
MRunyan:lb
04/
/86
5 '6
RI I
pP
GBelisle
04/ f/86
RI
(PP r
CJu ian
04/l'86
R I
redric
son
~2/86