Forwards Insp Rept 50-400/86-32 on 860421-25.No Violation or Deviation Noted
ML18003B250
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/14/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B251 List:
References
NUDOCS 8605200254
Download: ML18003B250 (2)


See also: IR 05000400/1986032

Text

P< (J~q

MAY 14

1S86

C rolina Power and Light Company

TTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/86-32

On April 21-25,

1986,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158

for your

Harris facility.

At the

conclusion

of

the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/86-32

cc w/encl:

P'.

A. Watson,

Vice President

arris Nuclear Project

'

Q. Parsons,

Project General

Manager

L. Willis, Plant General

Manager

RII~y

JBl ake

5/$ /86

~0.) l Q,~ Qg(

rU<i c.0s<o

~l~tl r~

5/

/86

bcc w/encl:

~ asasaooase

ssosie

PDR.

-ADQCK 05000400

Q

NRC Resident

Inspector

Document Control

Desk

, State of North Carolina

RII

RI

WL u:jw

AHerd

5/@ /86

>

t ~Of

P

g

v~U

I l

I*

b