DEC 09 l985
Ca olina Power
and Light Company
TN:
Mr.
E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 15S1
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-45
On
November 12-15,
1985,
NRC inspected activities authorized
by
NRC Construction
Permit
No.
CPPR-158 for your Harris facility.
At the conclusion of the inspec-
tion, the findings were discussed
with those
members of your staff identified in
the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
In
accordance
with Section
2.790
of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC's Public Document
Room.
Should you have
any questions
concerning =this letter,
please
contact
us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/8S-45
c w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
P'.
Parsons,
Project General
Manager
L.
Wi 1 1 i s,
Pl ant General
Manager
bcc w/encl:
(See
page
2)
8512230523
851209
ADOCK 05000400
I
8
Carolina
Power and Light
bcc w/encl:
RC Resident
Inspector
Document Control
Desk
State of North Carolina
R I
roup
~Hosey
Col
s
L ellen
+7~85
~/85
1+i
/85
1$/5 /85