Text
0
Carolina
Power
and Light Company
ATTN:
Nr.
E.
E. Utley
Senior Executive Vice President
Power Supply and Engineer ing
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-44
On
November
5-8,
1985,
NRC inspected activities authorized
by
NRC Construction
Permit
No.
CPPR-158
for your Harris facility.
At the
conclusion
of
the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
In
accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part
2,
Title 10,
Code of Federal
Regulations,
a copy, of this letter and its enclosure
will be placed in the
NRC's Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/85-44
c w/encl:
.
AD Watson,
Vice President
Harris Nuclear Project
.
M. Parsons,
Project General
Manager
/J .
L. Willis, Plant General
Manager
bcc w/encl:
(See
Page
2)x
8512120312, 851 127
ADOCK 05000400
8
E
Carolina
Power and Light Company
bgc w/encl:
NRC Resident
Inspector
Document Control
Desk
State of North Carolina
RII
~
II
RI
RII
RII
PSto
art:bhg
W
ine
DCollins
LMe len
PFr drickson
11M/85
11@/85
11/@85
11+/85
11/~85