ML18003B123

From kanterella
Jump to navigation Jump to search
Forwards Electrical Separation Analysis, Per 850404 Insp Rept 50-400/85-08.Analysis Allows for 1-inch Separation Between Encl non-Class 1E Raceway & Open Top Class 1E Raceway.Fsar Section 8.3.1.2 to Be Revised
Date released: 08/31/2018 Download: ML18003B123


Electrical Separation Analysis.
ML18003B124
Person / Time
Site: Harris 
Issue date: 12/31/1984
From:
EBASCO SERVICES, INC.
To:
References
Download: ML18003B124 (19)
Forwards Electrical Separation Analysis, Per 850404 Insp Rept 50-400/85-08.Analysis Allows for 1-inch Separation Between Encl non-Class 1E Raceway & Open Top Class 1E Raceway.Fsar Section 8.3.1.2 to Be Revised
ML18003B122
Person / Time
Site: Harris 
Issue date: 06/19/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML18003B122 (4)