ML18003B099
| ML18003B099 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/06/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18003B100 | List: |
| References | |
| NUDOCS 8504160441 | |
| Download: ML18003B099 (2) | |
See also: IR 05000400/1985006
Text
6 1985
Carolina
Power and Light Company
ATTN:
Mr.
E.
E. Utley
Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-06
On February
5 - 8,
1985,
NRC inspected activities authorized
by NRC Construction
Permit
No.
CPPR-158
for your Harris facility.
At the
conclusion
of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the scope of the inspection,
no violations or deviations
were identified.
~
~
Should you have any questions
concerning this letter, please
contact
us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of:Reactor Projects
Enclosure:
Inspection Report
No. 50-400/85-06
cc w/encl:
R.
A. Watson,
Vice President
Harris Nuclear Project
R.
M. Parsons,
Project General
Manager
lake
/( /85
bcc w/encl:
NRC Resident Inspector
Document Control
Desk
State of North Carolina
'.",
WPAng:sa
02/z7/85
85041b0441