Forwards Insp Rept 50-400/85-06 on 850205-08.No Violation or Deviation Noted
ML18003B099
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/06/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B100 List:
References
NUDOCS 8504160441
Download: ML18003B099 (2)


See also: IR 05000400/1985006

Text

MAR

6 1985

Carolina

Power and Light Company

ATTN:

Mr.

E.

E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-06

On February

5 - 8,

1985,

NRC inspected activities authorized

by NRC Construction

Permit

No.

CPPR-158

for your Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

~

~

Should you have any questions

concerning this letter, please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of:Reactor Projects

Enclosure:

Inspection Report

No. 50-400/85-06

cc w/encl:

R.

A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

lake

/( /85

bcc w/encl:

NRC Resident Inspector

Document Control

Desk

State of North Carolina

'.",

WPAng:sa

02/z7/85

85041b0441

85030b

PDR

ADOCK 05000400

. 8

PDR

RII~+

ARHerdt

03/

( /85

1

k