UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MzR as 1985 Docket No.:
50-400 Mr. E.
E. Utley Executive Vice President Power Supply and Engineerinq and Construction Carolina Power 8 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602
Dear Mr. Utley:
Subject:
Request for Additional Information Following Preliminary Staff Review of Carolina Power and Light Companv's
Response
to Generic Letter 83-28 Re:
(Shearon Harris Power Station, Unit No.
1)
The staff has completed a preliminary review to assess the completeness and adequacy of your responses to Generic Letter 83-28 Items 2.1, 2.2, 3. 1.3, 3.2.3, 4.5.2 and 4.5.3.
For the Shearon Harris, Unit 1, your responses were found to be incomplete for Items 2.1, 2.2.1, 2.2.2, 3.1.3, 3.2.3, 4.5.2 and 4.5.3.
Brief descriptions of the deficiencies are given as guidelines for corrective action in the enclosed request for additional information.
Efforts by Owners
- Groups, INPO and NSSS Vendors have been or are being made to produce generic responses that may be useful in meeting the requirements of Generic Letter 83-28 Items 2. 1, 2.2. 1, 2.2.2, 4.5.2 and 4.5.3.
You may wish to contact your Owner's Group or INPO regarding the applicability of such generic responses to Shearon Harris, Unit 1.
In order to preserve our present review schedule, the staff need to have the supplementary information within 60 days for Items 2. 1, 2.2. 1, 2.2.2, 3. 1.3, and 3.2.3 and within 90 days of Items 4.5.2 and 4.5.3.
We request your cooperation in meeting this schedule.
8504050370 850325 PDR ADOCK 05000400 A
PDR 0
This request for additional information was approved by the Office of Management and Budget under clearance number 3150-0011 which expires April 30, 1985.
Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C.
20503.
Sincerely,.
Enclosure:
As stated cc:
See next page OAI.(jlgAQgagFg py 4
George W. Knighton, Chief Licensing Branch No.'
Division of Licensing DISTRIBUTION
-50:-400 NRC PDR LPDR NSIC PRC System LB¹3 Reading JLee BBuckley BGrimes JPartlow EJordan
- Attorney, OELD ACRS (16)
TAlexion DLasher DBeckham RAuluck JHopkins JSteven DL. 8¹ DL BBuckley/yt hton 3/55~85 3/ggg5
~
lll h ~
~
h
~
h ~
h n
h V
h h
p h
Mr. E.
E. Utley Executive Vice President Power Supply and Engineering and Construction Carolina Power
& Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 George F. Trowbridge, Fsq.
Shaw, Pittman, Potts
& Trowbridge 1800 M Street, NW Washington, DC 20036 Richard E. Jones, Esq.
Associate General Counsel Carolina Power
& Light Company 411 Fayetteville Street Mall Raleigh, North Carolina 27602 M. David Gordon, Esq.
Associate Attorney General State of North Carolina Post Office Box 629
- Raleigh, North Carolina 27602 Thomas S. Erwin, Esq.
115 W. Morgan, Street Raleigh, North Carolina 27602 Mr. George Maxwell Resident Inspector/Harris NPS c/o U.S. Nuclear Reaulatory Commission Route 1,
Box 315B New Hill, North Carolina.
27562 Charles D. Barham, Jr., Esq.
Vice President
& Senior Counsel Carolina Power
& Light Company Post Office Box 1551 Raleigh, North Carolina 27602 Mr. John Runkle, Executive Coordinator Conservation Council of North Carolina 307 Granville Road Chapel Hill, North Carolina 27514 Mr. Wells Eddleman 718-A Iredel l Street Durham, North Carolina 27705 Shearon Harris Mr. George Jackson, Secretary Environmental Law Project School of Law, 064-A Univeristy of North Carolina Chapel Hill, North Carolina 27514 Dr. Phyllis Lotchin 108 Bridle Run Chapel Hill, North Carolina 27514 Mr. Travis Payne, Esq.
723 W. Johnson Street Post Office Box 12643
- Raleigh, North Carolina 27605 Mr. Daniel F.
Read CHANGE Post Office Box 2151
- Raleigh, North Carolina 27602 Bradley W. Jones, Esq.
U.S. Nuclear Regulatory Comm.
Region II 101 Marietta Street Atlanta, Georgia 30303 Richard D. Wilson, M. D.
725 Hunter Street Apex, North Carolina 27502 Regional Administrator - Region
? I U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303 Mr. Robert P.
Gruber Executive Director Public Staff -
NCUC Post Office Box 991 Raleigh, North Carolina 27602
Dr. Linda Little Governor's Waste Management Board 513 Albemarle Building 325 North Salisbury Street Raleigh, North Carolina 27611
Shearon Harris, Unit 1
Re vest or strong n ormation Item 2. 1 (part 1) - Incomplete Supply a statement confirming that reactor trip system components were reviewed and that they are identified as safety-related on documents, procedures and information handling systems.
Item 2. 1 (part 2) - Incomplete Submit detailed information describing your vendor interface program for reactor trip system components.
Information supplies should state how the proqram assures that vendor technical information is kept complete, current and controlled throughout the life of the plant and should also indicate how the program will be implemented at Shearon Harris, Unit 1.
Item 2.2.1 - Incomplete Submit information on how equipment will be classified as safety-related and will be designated as such on plant documentation as requested in sub-items 2.2.1.1 to 2.2.1.6.
Item 2.2.2 - Incomplete Submit detailed information describing your vendor interface program for all safety-related components.
Information supplied should state how the program assures that vendor technical information is kept complete, current and controlled throughout the life of the plant and should also indicate how the program will be implemented at Shearon Harris, Unit 1. If the recommendations of NUTAC are to be implemented at Shearon Harris, Unit 1 you need to supplement your response to address to concern about establishing and maintaining an interface with all vendors of safety-related equipment since the staff found NUTAC lacking in this respect.
Item 3. 1. 3 - Incomplete Results of review of test and maintenance proqrams shall identify any post-maintenance testing that may degrade rather than enhance safety and shall described actions to be taken including submitting needed Technical Specification changes.
Item 3.2.3 - Incomplete Same as item 3.1.3.
Item 4.5. 2 - Incompl ete Provide a description of the design provisions that will permit on-line testing of the reactor trip system.
Item 4.5.3 - Incomplete Provide results of review of existing or proposed intervals for on-line testing considering the concerns of 4.5.3. 1 to 4.5.3.5 in the generic letter.
Proposed Technical Specification changes resulting from this review shall be submitted for review.