ML18003B079

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/85-05 on 850211-15.No Violation or Deviation Noted
ML18003B079
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/27/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B080 List:
References
NUDOCS 8503210019
Download: ML18003B079 (2)


See also: IR 05000400/1985005

Text

~

~

~

~

~

~

~

Carolina

Power and Light Company

ATTN:

Mr.

E.

E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO ~

50-400/85-05

On February

11-15,

1985,

NRC inspected activities authorized

by NRC Construction

Permit

No.

CPPR-158 for your Shearon

Harris facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

Should you have any questions

concerning this letter, please

contact

us.

Sincerely,

Enclosure:

Inspection Report

No. 50-400/85-05

cc w/encl:

R.

A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons

Project General

Manager

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

bcc w/encl:

Senior

Resident

Inspector

State of North Carolina

Document Control

Desk

t

RII

TDec er

line

2/ 4/85

2g;)85

P

edri ckson

2~//85

RII

R

DCollins

2/QT85

85032i00i9 850gg7

PDR

ADOCK 05000400

8

PDR

P