ML18003B063

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/84-44 on 841120-1220.No Violations or Deviations Identified
ML18003B063
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/17/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B064 List:
References
NUDOCS 8503060826
Download: ML18003B063 (3)


See also: IR 05000400/1984044

Text

~E,SL SSKQy,

C+

V>0

SS

cP I

CSO

'

V

+

WP

o

0' t +

JAN g

II

',C",.5

Carolina

Power and Light Company

ATTN:

Mr.

E.

E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

"<<~L

h'I

V

4

<<<<<<

CAR%It.'" RAFA 6 Ll&) (D.

NUCLEAR REGULATORY COMMISSIO

REGION II

101MARIETTA STREET. N.w.

-.

-'

Exhxb>t.-.9

ATLANTA,GEORGIA30323;~

~', ~...,

t~g$/gg

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/84"44

.j

I

On November

20 - December

20,

1984,

NRC inspected activities authorized

by

NRC

Construction

Permit

No.

CPPR-158

for your

Shearon

Harris facility.

At the

conclusion of the inspection,

the findings were discussed

with those

members of

your staff identified in the enclosed

inspection report.

Areas

examined

during the inspection are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

Your attention

is invited to unresolved

items identified in the inspection

report.

These matters

will be pursued

during future inspections.

In accordance

with 10

CFR'2. 790(a},

a

copy of this letter, its enclosures,

and

your reply wi 11

be placed

in NRC's Public

Document

Room upon completion of our

evaluation of the reply.

If you wish to withhold information contained therein,

please

notify this office by telephone

and include

a written application to

withhold information in your response.

Such application must

be consistent with

the requirements

of 2.790(b)(1).

Should you have

any questions

concerning this letter, please contact us.

Sincerely,

I

t.!

uc

s

r

c ~'I

0

id M.

rrelli, Chief

Reactor

ojects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection Report

No. 50-400/84-44

cc w/encl:

(See

page

2)

Carolina

Power

and Light Company

cc w/encl:

R.

A. Watson, Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

DOCUivic,i<T QpgTPOl