Forwards Insp Rept 50-400/85-02 on 850108-11.No Violations or Deviations Noted
ML18003B059
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/30/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B060 List:
References
NUDOCS 8503060167
Download: ML18003B059 (4)


See also: IR 05000400/1985002

Text

Carolina

Power

and Light Company

ATTN:

Mr. E.

E. Utley

Executive Vice President

Power

Supply and Engineering

and Construction

411 Fayettevi1 le Street

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-02

On January 8-11,

1985,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158 for your

Shearon

Harris facility.

At the conclusion of the

inspection,

the findings were discussed

with those

members of your staff identi-

fied in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

~

~

~

in progress.

Within the scope .of the inspection,

no violations or deviations

were identified.

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-400/85-02

cc w/encl:

R. A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

bcc w/encl:

(See

page

2)

85030b

OC< 05000400

Oib7 850i30

PDR

AD

L

V

])',Agll

, if

rt *

Carolina

Power and Light Company

bcc w/encl:

NRC Resident Inspector

Document Control

Desk

State of North Carolina

RII

GSc nebli:cdg

01/98/85

RI I

Flap

erdt

01/g P/85

1/PS/85

4'r

P