ML18003B059
| ML18003B059 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/30/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18003B060 | List: |
| References | |
| NUDOCS 8503060167 | |
| Download: ML18003B059 (4) | |
See also: IR 05000400/1985002
Text
Carolina
Power
and Light Company
ATTN:
Mr. E.
E. Utley
Executive Vice President
Power
Supply and Engineering
and Construction
411 Fayettevi1 le Street
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-02
On January 8-11,
1985,
NRC inspected activities authorized
by
NRC Construction
Permit
No.
CPPR-158 for your
Shearon
Harris facility.
At the conclusion of the
inspection,
the findings were discussed
with those
members of your staff identi-
fied in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
~
~
~
in progress.
Within the scope .of the inspection,
no violations or deviations
were identified.
Should you have any questions
concerning this letter, please
contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-400/85-02
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
R.
M. Parsons,
Project General
Manager
bcc w/encl:
(See
page
2)
85030b
OC< 05000400
Oib7 850i30
L
V
])',Agll
, if
rt *
Carolina
Power and Light Company
bcc w/encl:
NRC Resident Inspector
Document Control
Desk
State of North Carolina
RII
GSc nebli:cdg
01/98/85
RI I
Flap
erdt
01/g P/85
1/PS/85
4'r
P