ML18003A926
| ML18003A926 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/22/1983 |
| From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| LAP-83-226, NUDOCS 8306270100 | |
| Download: ML18003A926 (8) | |
Text
t
- REGULATO, INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR: 8306270100 DOC ~ DATE: 83/06/22 NOTARIZED:
NO FACIL:50-OOOShear on Harris Nuclear Power Planti Unit 1< Carolina
,50-401 Shearon Har rfs Nuclear power Plant~ Unit 2~ Carolina AUTH INANE AUTHOR AFFILIATION MCDUFFIEgM ~ A Carolina Power L Light'o RECIPoNAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuc1 ear Reactor Regul ationi Director-DOCKET 05000400 05000001
SUBJECT:
Forwards nesponses to dryft SER Open Items 290 8
291 ve combined ~seismic L dynamic loads to be used in qualification program L qualification of safety related electrical equipmentirespectively.
DISTRIBUTION CODEX'048S COPIES RECEIVED:LTR,g ENCL SIZEe.
/
9 TITLE: OR/Licensing Submittal:
Equipment Qualification NOTES:
RECIPIENT ID CODE/NAME NRR LB3 BC 12 COPIES LTTR ENCL 0
RECIPIENT ID CODE/NAME KADAMBI g P 01.
COPIES LTTR ENCL 1
1 INTERNALS ELD/HDS1 IE FILE NRR/DE/EQB NRR/DL 0 I
EXTERNALS ACRS NRC PDR NTIS 1?..
09 07 06 0Q 15 02 31 1
1 1
2 2
1 1
8 8
1 1
1 1
LPDR NSIC 03 05 GC 13 NRR CALVOgJ NRR/DL D IR 14 NRR/DSI/AEB RGN2 1
1 1,1 1
1 1
1 1
1' 1
1
, TOTAL NUMBER OF COPIES REQU'IRED:
LTTR 25 ENCL 24
I 0
)
I hf h,
)
El hf ll I
pf
'E I
lf ll fll lg fh
~
~
1 I
I I
hf ll I,
hf I
0 l)
C l'f
'I hf Il
- CIGAR, Carolina Power 8 Light Company JUN ap ]gyp SERIAL:
LAP-83-226 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~
1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 DRAFT SAFETY EVALUATIONREPORT RESPONSES EQUIPMENT QUALIFICATIONBRANCH
Dear Mr. Denton:
Carolina Power
& Light Company (CP&L) hereby transmits one original and forty copies of responses to Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report Open Items.
These responses are for the Equipment Qualification Branch, and are CP&L Open Item Nos.
290 and 291.
We will be providing responses to other Open Items in the Draft Safety Evaluation Report shortly.
Yours very truly, JDK/ccc (7041JDK)
M. A. McDuffie Senior Vice President Engineering
& Construction cct Mr. N. Prasad Kadambi (NRC)
Mr. A. Mascientonio (NRC)
Mr. G. F. Maxwell (NRO-SHNPP)
Mr. J.
P. O'Reilly (NRC-RII)
Mr. Travis Payne (KUDZU)
Mr. Daniel F.
Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis tutchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. R. Wright Mr. G. 0. Bright (ASLB)
Dr. J.
H. Carpenter (ASLB)
Mr. J. L. Kelley (ASLB) 8306270100 830M2 PDR ADGCK 05000400 E
PDR 411 Fayetteville Street
+ P. O. Box 1551
~ Raleigh, N. C. 27602 tIt
~
C' 0
Shearon Harris Nuclear Power Plant Draft SER en Item No. 290 Based on the criteria defined in SRP 3.10, IEEE 323-1974 and 344-1975 are the standards that the applicant must follow, and a future revision to the FSAR should clearly indicate such a commitment.
Also missing from the FSAR Section 3.10 is any indication of the combined seismic and dynamic loads to be used in the qualification program.
~Res onse The SHNPP commitment to IEEE-323-1974 and IEEE-344-1975 for seismic qualification of seismic Category I electric equipment is indicated in Section 3.10.1.2.
This commitment is clarified as follows:
Seismic and dynamic qualification is considered an integral part of environmental qualification.
For equipment located in mild environment as defined in 10CFR50.49, consideration of aging aspects of environmental qualification are, as a minimum, assured by SHNPP compliance with the general quality and surveillance requirements applicable to electric equip-ment in accordance with other regulations such as
For all other electric equipment, the aging and test sequence aspects of seismic qualification are based on the requirements of IEEE-323-1974.
Additional details regarding the SHNPP commitment and methodology for environmental qualification, including consideration of the need for equipment preaging prior to seismic test will be provided in Appendix 3.11D (Compliance with NUREG-0588) in a future amendment.
Combined seismic and dynamic loads are utilized where applicable in the qualification program for electric equipment.
Additional information and detailed loads used, will be provided in accordance with Mr. G. M.
Knighton's letter to Mr. E. E. Utley dated February 2,
- 1983, regarding Additional Information for Seismic and Dynamic Qualification Review for Shearon Harris Units 1 and 2.
This information willalso be incorporated into Section 3.10.
O L
Shearon Harris Nuclear Power Plant 0 en Item No. 291 When complete information is provided to ensure qualification of safety-related electrical and mechanical equipment, the staff willaudit the applicant's electrical equipment qualification files.
A supplemental safety evaluation report (SSER) will be prepared after completion of the audit.
Included in that SSER will be the staff evaluation of the environmental qualification of mechanical equipment.
Documentation to substantiate environmental qualification of mechanical equipment will be reviewed by the staff separately from the electrical equipment audit.
Response
This is a confirmatory item.
The qualification program for safety related equipment at the Shearon Harris Nuclear Power Plant is in progress.
The NRC will be informed when 85-90% of the safety related equipment has been installed, and the appropriate documentation will be provided in accordance with Mr. G.
W. Knighton's letter to Mr. E. E. Utley dated February 2, 1983,'egarding Additional Information for Seismic and Dynamic Qualification Review for Shearon Harris Units 1 and 2.