Forwards Response to Draft SER Open Item 165 Re Solid Waste Processing Sys & Item 176 Concerning Process Control Program.Absence of Free Water Will Be Verified by Use of Process Control Program Per Tech Spec 3/4.11.3
ML18003A914
Person / Time
Site: Harris  
Issue date: 06/17/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
LAP-83-219, NUDOCS 8306210204
Download: ML18003A914 (8)


Text

~ ~r REOULATOIINFORMATION DISTRIBUTION +TEN (RIDE)

ACCE'SSION NBR e 8306210204, DOC ~ DATE: 83/06/17 NOTARIZED:

NO FACIL:50 400 Shear on Har r i s Nuclear Power P 1 anti Uni t 1 q Car ol ina 50 401 Shearon Harris Nuclear Power Planti Unit 2i Carolina AUTH BYNAME AUTHOR AFFILIATION MCDUFFIEiM~ A ~

Car ol ina l'ower 8 Light Co, RECAP NAME RECIPIENT AFFILIATION DKNTONiH~ R>>

Office of Nuclear Reactor Regulationi Director

SUBJECT:

Forwards response,to draft SER Open 1tem 165 re solid waste processing sys 8 Item 176 concerning process control program, Absence of free water will be verified by use of process control program per Tech Spec 3/4.11,3.

DISTRIBUTION CODE s B001S COPIES RECEI VED: LTR g ENCL.

SIZE s, TlTLE; Licensing Submittal:

PSAR/FSAR Amdts 8 Aelated Correspondence NOTES:

DOCKET 05000400 05000401 INTERN RECIPIENT ID,CODE/NAME NRA/DL/ADL NRR I.B3 LA ALe ELD/HDSi IE/DEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DE/SGEB 30 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 NRA S I/RA8 22 04 DANI/MI8 COPIES LTTR ENCL 1

0 1

0 0

1 1

1 1

2 2

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 0

RECIPIENT ID CODE/NAt<E NRR LB3 BC KADAMBIg P 01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AE8 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN2 COPIES LTTR ENCL

'1 1

1 1

1 1

1 0

1 1

2 2"

1 i

1 1

1 1i 1

1 1

1 3

EXTERNALS ACRS 41 DM8/DSS (AtdDTS)

LPDR 03 NSIC 05 6

6 1

1 1

1 1

BNL(AMDTS ONLY)

FEMA REl DIV 39 NRC PDR 02 NTIS TOTAL NUMBER OF COPIES REQUIRED:

LTTR 54 ENCL 47

tj I

I II

< '1 j44.

4 K ~,

KK

4.

ry re] )

tr ltttll tt 1 t'

1<<)

I I I

1 trl II 4

ll ~

~

If lt <<$

K M

II

'l j

4I p

I'44 jj

,gP Il 44,

,44 LI 14 K

,I

'I 4

tt 4 Il i ll

'j IP ll

'4 r

C%QE, Carolina Power 8 Light Company JON 17 1883 SERIAL:

LAP-83-219 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~

1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT RESPONSES;'ETEOROLOGICAL"lr EFFLUENT TREATMENT BRANCH

'ear Mr. Denton:

Carolina Power 6 Light Company (CP&L) hereby transmits one original and forty copies of the responses to Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report Open Item Nos.

165, and 176.

We will be providing responses to other Open Items in the Draft Safety Evaluation Report shortly.

Yours very truly, M. A. McDuffie Senior Vice President Engineering 6 Construction JDK/lcv (7020JDK) cct Mr. N. Prasad Kadambi Mr. J. J.

Hayes Mr. J.

P. O'Reilly Mr. Travis Payne Mr. Daniel F. Read Chapel Hill Public Library Wake County Public Library (NRC)

(NRC-METB)

(NRC-RII)

(KUDZU)

(CHANGE/ELP)

Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr ~

G. 0. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB) 83062i0204 8306i7 PDR ADOCK OS000400 E

PDR 411 Fayetteville Street

+ P. O. 8ox 1551 o Raleigh, N. C. 27602

f,'~9) i' VAli; t

SHEARON HARRIS NUCLEAR POWER PLANT DRAFT SAFETY EVALUATIONREPORT (DSER)

OPEN ITEN 165 (DSER SECTION 11 ~ 4 ~ 2 PAGE 11-22)

The staff will not approve the design of the Solid Waste Processing System until the applicant provides information detailing how various waste components are treated.

Information that is missing includes:

a commitment to a program whereby the presence of free water in the waste container is verified and a commitment to reprocessing the container when free water is discovered.

RESPONSE

The absence of free water is to be verified by the use of a Process Control Program in accordance with SHNPP Technical Specification 3/4.11.3.

FSAR Section 11.4.2 will be amended to include a reference to the Process Control Program and to commit to reprocessing the container when free water is discovered.

(7020JDKlcv)

r A

CI

Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report (DSER) 0 en Item 176 (DSER Section 11.4.2 a e 11-23)

The applicant has not provided the process control program (PCP).

The PCP is not required until 6 months before the issuance of the Operating License.

The PCP will be judged as to its acceptability when it is submitted.

~Res esse The Solid Radwaste System shall be operated in accordance with a Process Control Program for solidification and packaging of radioactive waste.

The PCP is currently being developed using the guidance of NUREG 0472 and NUREG 0133, and it shall be operated in accordance to SHNPP Technical Specification 3/4.11.3.

As specified by SHNPP Administrative Technical Specification 6.13.1, the PCP is scheduled for completion and submittal to the NRC six months prior to the issuance of the Operating License.

The basic objectives of the PCP are as follows:

shall be taken and analyzed.

2.

Waste Anal sis Samples shall be analyzed for pH, percent solids, percent boron boric acid, and activity as appropriate.

Every tenth batch of each type of waste shall have a sample solidification performed using the appropriate solidification formulas to verify that there is no free standing water.

3.

Records The appropriate solidification worksheet shall be used as a

record of the solidification operation and provide documentation for the PCP.

Carolina Power 6 Light Company considers this a Confirmatory Item.