Requests Approved Ref Matl Re Operator Exams by 830425. Missing Deadline Will Result in Delay in Administering Exams.Applications Should Be Submitted at Least 60 Days Prior to First Exam Scheduled for 830613
ML18003A892
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/08/1983
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Furr B
Carolina Power & Light Co
References
NUDOCS 8306140132
Download: ML18003A892 (8)


Text

REGULATORY FORMATION DISTRIBUTION "S M (RIDS)

AOCE'SS ION NBR: 8306140132 DOO ~ DATEt 83/04/08 NOTARI'ZED:

NO FAQIL:.50 400 "Shear on Harri-s Nuclear Power Planti Unit 1< Carolina 50 401 Shearon Harris Nuclear Power Planti Unit 2'i 'Carolina AUTH BYNAME AUTHOR AFFILIATION VERRELLIrDIM~

Division of ProJect L Resident Rrograms "RBCIP ~ NAME RECIPIENT AFFILIATION FURR 8 J ~

>Car ol ina Power I Light Co,

SUBJECT:

Requests

-approved ref matl re operator exams by 830425

'issing deadline., will result in delay in.administering exams,Appl)cations ishould be"submitted at least 60 days

.prior to first exam ischeduled for

830613, DISTRIBUTION iCODE S M003S

~COPIES RECEIVED:lTR,ENCl 'IZE:-

I TITLE: Operator Requalification Program NOTES:

DOCKET 05000400 05000401 RECIPIENT ID CODE/NAME NRR L83 BC INTERNAL+ NRR/DHFS/OLB 01 RGN2

<<COPIES RECIPIENT LTTR ENCl ID 'CODE/NAME 1

1 KADAMBI'iP 2

2,~ REG 1

COPIES LTTR ENCL 1

1 1

1 EXTERNALS ACRS LPDR NSIC 08 16 16 03 1

1 05 1

1 INPOeJ

~ STARNES NRC PDR 02 NTIS 1

1 1

1 1

iTOTAL NUMBER -OF ~COPIES REQUIRED e UTTR 27 ENCL 27

(4 J

f

>ill l

Af f<<t <<it>

II i J tt4 f fWA >f4 r,y>>

>i VS>>

>,",<'4, f'>>

4 F>>>I 'WF'I

'-,tk)WJk tt'6 a>>),W "J

,i Il E',

l ff<<>

lf l jl i>>,

I H)

V 4"

>if )4 t,

I

>1 >>>l Ft I

itif f fg

~ wi, t>

I n

~

'I

~

~

~

4 III I

H

~ ~

I F '>>

t

"'"I~ '4

'l~g r>>>> f

<<>>4 I, <<jar

,',4 r, 1 4>>.II'<<$

P l

'>4F>>

f II f-

!'"'4>>wtIH,AWWf,g,>4 f i Itive '4'>>><<PF> ',i>>>g f44>>"

Fl

~ ><<,

F~

A>P II' ll t

FI n

)

I t

W l

L)f j

<<ff f [I I

'$>4 t,

>1 4

~

) 2 g 'j, j tt 44 tX I

I WII

~

It I',I II II

>>I )g>F l>

i

>>l

~ >

FI'

'>><<4 H

>>4 I 4Il

April 8, 1983 Carolina Power and Light Company ATTN:

Mr. B. J. Furr, Vice President of Nuclear Operations P. 0.

Box 1551

Raleigh, NC 27602 Gentlemen:

SUBJECT'PERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. Wayne Powell, Senior Training Specialist, and Mr. Timothy Norris, Operator Licensing Section, arrangements were made for the administration of the Instructor Certification examinations at the Shearon Harris Training Center.

The written and simulator examinations are scheduled for June 13 - 14, 1983.

In order for us to meet the above schedule, it will be necessary for the facility to furnish the approved reference material as agreed to between Mr. Powell and Mr. Norris by April 25, 1983.

Any delay in receiving this material will result in a delay in administering of the examinations.

Our examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the examination dates requested by the various facilities.

Therefore, missing the April 25, deadline even by a few days, will likely result in a long delay, since it would not be possible to reschedule examinations at other facilities.

Mr. Powell has been advised of our reference material require-

ments, the number of reference material sets that are required, and the examiners'ames and addresses where each set is to be mailed.

The facility-management is responsible for providing adequate space and facil-ities for conducting the written examinations.

The Enclosure, "Administration of Operator Licensing Written Examinations", describes our requirements for con-ducting these examinations.

Mr. Powell has been informed of these requi rements.

All operator and senior license applications should be submitted on NRC Form 398 at least 60 days prior to the first examination date so that we will be able to review the training and experience of the candidates, process the medical certi-fications, and prepare final examiner assignments after candidate eligibility has been determined.

830bi40132 830408

'- PDR ADOCK 05000400

~ iV'- =- ', (,:-.,'- i'< PDR.

0 1

Carolina Power and Light Company April 8, 1983 Thank you for your consideration in this matter.

If you have any questions regarding the examination procedures and requirements, please contact Mr. Bruce A. Wilson, 404/221-5542, or Mr. Timothy L. Norris, 404/221-4178.

S incerely, (Original'igned by DMVerrelli)

Enclosure:

"Administration of Operator Licensing Written Examinations" D.

M. Verrelli, Chief Project Branch 1

Division of Project and Resident Programs cc w/encl:

L. Veeder, Facility Training Supervisor J.

L. Willis, Plant Superintendent bcc w/encl:

Resident Inspector, G. Maxwell Document Management Branch RI T Norris:sa 04/PI /83 RI I lail son 04/

) /83 RII AFGibson 04/

/83 RI I 09errelli 04/3 /83

4 J

t Jl S

IJ

~,

N t

NIil

~

II 4

ENCLOSURE ADMINISTRATION OF OPERATOR LICENSING WRITTEN EXAMINATIONS Operator Licensing Branch Requirements:

1.

A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility/contractor personnel during the duration of the written examination.

If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building.

Obtaining this room is the responsibility of the licensee.

2.

Minimum spacing is one candidate per 5

X 24 ft., minimum size table with 3 foot spacing between tables.

No wall charts,

models, and/or other training materials shall be present in the examining room.

3.

Suitable arrangements are to be made by the facility for the candidates to have lunch, coffee, etc.

These arrangements will be reviewed by the examiner and/or proctor.

4.

The facility shall arrange to have a maximum of three knowledgeable personnel available to review the examination questions and answer key.

This review will only begin after the start of the written examination and normally be limited to two hours.

5.

The examiner will provide pads of paper for each candidate's use in completing the examination.

All reference material needed to complete the examination will be furnished by the examiner.

Candidates can bring calculators or slide rules but no other equipment or reference material to the examination room.

6.

Only black ink or pencil should be used for writing answers to questions.