Forwards Response to Draft SER Open Item 182 Re Process & Effluent Monitoring Program
ML18003A881
Person / Time
Site: Harris  
Issue date: 06/02/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
LAP-83-163, NUDOCS 8306070122
Download: ML18003A881 (6)


Text

REGULATO INPORMATION DISTRIBUTION STEM (RIBS>

'AOCBSSION NBR 8306070122 DOC ~ DATE ~ 83/06/02 NOTARIZED NO FAOIL:50 400 Shearon Harris Nuclear Power Plantr Unit i~..Carolina

,50 401 Shearon Harris Nuclear Power Plant< Unit 2~ Carolina AUTHoNAME AUTHOR AFFILIATION MCDUFFIEr M ~ A ~

>Carool ina -Power 8 Light Co ~

RBCIP NAME RECIPIENT AFFILIATION DENTONEH,R<

.Office of Nuclear 'Reactor Regulationi Director SUBJECT!

Forwards response to draf;t SER Open Item 182 rTe process 8

effluent monitoring program, DISTRIBUTION iCODE:

SOOIS COPIES RECEIVED:LTR,.g ENCL j SIZE:.~

TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8, Related Correspondence NOTES; RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNALS ELD/HDS1 IE/DEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB ii NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 2'RR/DE/SGEB30 NRR/DHFS/LQB 3?

NRR/DL/SSPB

. NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/HETB 1?

NR JlSIJRAB 22 EG 00 AMI/MID EXTERNAL'CRS 41 DHB/DSS (AMDTS)

L'PDR "03 NSIC 05

~COPIES LTTR ENCL 1

0 1

0 1

0 3

3 1

1 1

1 2

2 1

1 1

1 1

1 0

1 1

1 i

1 1

1 1

i 0

6 6

1 1

1 RECIPIENT ID 'CODE/NAME NRR LB3 BC KADAMBIg P 01 IE F ILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/HFEB00 NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DSI/XCSB 16 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN2 BNL(AHDTS ONLY)

FEHA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

1 1

1 0

1 1

'2 2

1 1

?

2 1

1 1

1 1

1 1

1 1

1 1

"3 3

1 1i 1

>TOTAL NUMBER OF COPIES REQUIRED 0 L'TTR 55 ENCL 48

T f'w

$ W'f tl w

II W',

w q wilf it f il

l~j

>> It'W f t I, f Wtttt

gent,

~

l,W W

'l(>>t f,) II i

(

f

'i!44$ f f

44 t4, ew iI It 44 Y Ill 4

l

'll "4 l

'I ws'

'ww 4 i 'I'l W4, I

f i

ill i

) f 'i 4

~IWW I ~

Ilt ~

f J(

II

'1 wit 4 f

%tt'.

w 4WI) 'tl 4

t ' I

4. lI" II ilw>44 f m

<<~WWW ~

ttw i)

WW,W i

W II i

)

i$

it w ill il 6

r Jl i>>,

llaw'4

~ f 4

if 4'j f II i

w

<1 <I II g

il r

W 44 lt Cwi

~

w 44" w,

'I,

CSKIN, Carolina Power 8 Light Company JUN D8 1983 SERIAL:

LAP-83-163 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Uni.ted States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.

1 AND 2 DOCKET NOS. 50-400 AND 50-401 DRAFT SAFETY EVALUATIONREPORT RESPONSES METEOROLOGICAL & EFFLUENTS TREATMENT BRANCH

Dear Mr. Denton:

Carolina Power

& Light Company (CP&L) hereby transmits one original and forty copies of the response to the Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report (DSER)

CP&L Open Item 182.

Carolina Power

& Light Company will be providing responses to other Open Items in the DSER shortly.

Yours very truly, PS/lcv (6801PSA)

Enclosure M. A. McDuffie Senior Vice President Engineering

& Construction CC:

Mr. Jack Hayes (NRC-METH)

Mr. G. F. Maxwell (NRCWHNPP)

Mr. J.

P. O'Reilly (NRO-RII)

Mr. Travis Payne (KUDZU)

Mr. Daniel F. Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library Mr. N. Prasad Kadambi (NRC)

Mr. Wells Eddleman Dr. Phyllis Iotchin Ms. Patricia T. Newman Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB) 8306070i22 830602 PDR ADOCK 05000400 E

PDR J

411 Fayetteville Street

~ P. O. Box 1551 o Raleigh, N. C. 27602

~"

C h6;.l Qil <<"w

Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report (DSER)

Open Item 182 (DSER Section 11.5.2, a

e 11-27)

The applicant has indicated, in response to a staff question, that the process and effluent monitoring program will meet the guidelines of position C of RG 4.15 with one exception.

This exception is that Harris will make use of "nationally recognized standards" and willnot be limited to NBS-traceable standards only. It is the staff's position that any "nationally recognized standard" will be NBS traceable.

'Iherefore, the staff does not accept this proposed deviation to position C of RG 4.15.

Res onse to en Item 182 The Shearon Harris Nuclear Power Plant process and effluent monitoring program will meet the guidelines of position C of RG 4.15.

As called for by RG 4.15.C.6.1, radionuclides standards that have been certified by NBS or standards that have been obtained from suppliers who participate in measurement assurance activities with NBS will be used when their standards are available.

In these measurement assurance activities, the supplier's calibration'i value will agree with the NBS value within the overall uncertainty stated by the supplier in its certification of the same batch of sources (when these are sampled for measurement by NBS) or in its certification of similar sources.