Text
REGULATOR
'NFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR:830606020?
DOC,DATE: 83/06/02 NOTARIZED; NO FACIL:50-400 Shearon Harris Nuclear Power Plant~ Unit 1~ Carolina 50-401 Shearon Harris Nuclear Power Plant~
Unit 2~ Carolina AUTH INANE AUTHOR AFFILIATION MCDUFFIEiM.A.
Carolina Power L Light Co.
RE'C IP. NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regu-lationi Director S UBJECT:
Forwards response to dr af t SER Open Item 306 re rated load test sequence for diesel generator load acceptance testing.
FSAR Section 8'> 1 ~ 1,2. 14 K will be revised as listed in future
- amend, DISTRIBUTION CODEe B001S COPIES RECEIVED:LTR ENCL J SIZE ~
TITLE: Licensing Submittal:
PSAR/FSAR Amdts L Related Correspondence NOTES:
DOCKET 05000400 05000401 RECIPIENT ID CODE/NAME'RR/DL/ADL NRR LB3 LA INTERNAL+ ELD/HDS1 IE/DEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DE/SGEB 30 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CS8 09 NRR/DS I/METB 12 0
22 G
04 RM/DDAMI/MI8 EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
0 1
0 1
0 3
3 1
1 1
1 2
2 1
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1 1
1 1
1 0
6 6
1 1
1 1
1 RECIPIENT ID CODE/NAME NRR LB3 BC KADAMBIgP 01 IE FII E IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DF/GB 28 NRR/DE/MTEB 17 NRR/DF/SGEB 25 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN2 BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
0 1
1 2
2 1
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 3
1 1
1 1
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED ~
LTTR 55 ENCL f8
~+r ff
'w f
f e
e
~
0 y
m II r
fl JI lq Ik J
4
\\
C
~I
@ME, Carolina Power & Light Company JUN )31983 SFRIAL:
LAP-83-152 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~
1 AND 2 DOCKET NOS. 50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT RESPONSES POWER SYSTEMS BRANCH
Dear Mr. Denton:
Carolina Power
& Light Company (CP&L) hereby transmits one original and forty copies of responses to Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report Open Items.
This response is for the Power Systems
- Branch, and is CP&L Open Item Number 306.
We will be providing responses to other Open Items in the Draft Safety Evaluation Report shortly.
Yours very truly, JDK/ce (6780JDK)
Attachment M. A. McDuffie Senior Vice President Engineering
& Construction cc:
Mr. N. Prasad Kadambi (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J.
P. O'Reilly (NRC RII)
Mr. Travis Payne (KUDZU)
Mr. Daniel F. Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G.
O. Bright (ASLB)
Dr. J.
H. Carpenter (ASLB)
Mr. J. L. Kelley (ASLB) 8306060202 830602 PDR ADOCK 05000400 E
PDR 411 Fayettevllle Street o P. O. Box 1551 o Raleigh, N. C. 27602 ital
~l
0
>',~'>41,"'g RJ>>,
C,',
MI l
Shearon Harris Nuclear Power Plant Draft SER 0 en Item No.
306 (FSAR Section 8.3.1.1.2.14)
The response to NRC Question 430.102 does not provide the correct rated load test sequence for the diesel generator load acceptance testing.
The response is the reverse.
See technical specification and Regulatory guide 1.108.
~Res esse FSAR Section 8.3.1.1.2.14k will be revised as follows in a future amendment.
Rated Load test:
Load the diesel generator at 110% of its continuous rating (its 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> rating) and hold for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
Subsequently load the diesel generator for 100% of its continuous rating and hold for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />.