Discusses Placing of Fill Matls for Main Dam,Auxiliary Dam & Separating Dike.Impervious Core Matl Removed from Auxiliary Dam & Separating Dike Prior to Apr 1979.Dam & Dike Being Constructed Per Ebasco Svcs Spec CAR-SH-CH-4
ML18003A779
Person / Time
Site: Harris  
Issue date: 12/26/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8001030592
Download: ML18003A779 (4)


Text

REGUlATORY ORMATION DISTRI ACCESSION NBR t 8001030592 DOC ~ DATE: 79/12/2 PAt'It.:80 400 Shearori Bar ri s Nuclear Power Pl 50 Ilol Shearon FIarr'is Nuclear F'ower f l 50"402 Shearon Harris Nuc'Iear Power Pl AUTH'AME AUTHOR AFFILIAT'ION MCDOFFXKiM,A.

Caroline Power C Light Co.

RECIP;~AME AECII IKNi AFFILlAT/ON DENTUAiH,R, Offfce of NucTear Aeactor R

SUTION SY (RIOS) 6 NOTARIZED:

NO anti"Onion'i Carolina anti On'it 2i Caro'I'inc anti Onit 3i Carolina eguletion DOCKET 05QOI}400 o5oooltoi 05000Ej02

+dB SUBJECT Discusses placing of fill metis for main damieuxi separating dike. Impervious coI'e matl i emoved from de'm L separating"dike prior to Apri'I 1979,oam L d constructed per

Ebesco, Svcs Spec CAR SH CH 4, liary dam 8

'uxilfaiy ike be'ing OISTRIBUTION COOE:

COO2S COPIES RECEIVEO:LTR Q ENCL M TI L:

riv ionomments, NOTES:

SIZEe

/

WWWW~W

,, ACTION!

INTERNAL:

KG 07 5E'.

10 CST BNFT ANL>>

i2 GEOSCYEA BR" i4 At:bEAY ANALLY 16 RAO ASM'BR" AO KAVIAON TKCH OKLD 1

i ii 1

RECIPIENT COPIES I 5 GODK'/MAMK L>>T TR KN 05 PA S. KEBI uSEC 18 LA EP8 w~

1 RKCIPIENT IO COOK/NAME.

1/

Bc. ~PS'-'m Ao 'gloo gE.

02 NRC POR 09 EARN 8I KC BR 1i T'A/KOO i3 HYORO-METEOR i5 EFLT TRT SYS 19 O'ER

oSK, AO S1 TE AtIIALY COPIES I.rTA"BACL 1ii.ii 1

i EXTERNAL: 03 LPDR 20 NATL LAB 1

1 5

5 04 NSIC ACRS Lh-L4ug c.sd 4 wD 8'C min/ Z~

6 TOTAL NUMBER OF COPIES REQUIRED!

LTTR 28 ENCL

N 1

I W

,l l

Carolina Power 8 Light Company December 26,,

1979='r.

Harold R. Denton, Director Office of Nuclear Reactor Regulat ion United'tates 'uclear Regulatory Commiss ion Washington, D. C. '0555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2,, 3 AND 4 DOCKET NOS ~ 50-400, 50-401, 50-402,, AND 50-403'UXILIARY DAM AND SEPARATING DIKE

Dear Mr. Denton:

In Apri1, 1979, members of your staff expressed concern for the moisture content allowed by Ebasco Speci fication CAR-SH-CH-4 "Embankments, Dams, Dikes, and Channels" in placing fi11 mater ials for the Main Dam, Auxi1iary Dam, and Separat ing Dike.

As a result of conversat ions between your s taff and Caro 1ina Power

& Light Company (CP&L) pers one 11, Ebasco Speci fication CAR-SH-CH-4 was revised.

However, prior to the Apri1, 19 7 9 conversat ions, some impervious core material had been placed at the Auxiliary Separating Dike and at two 1ocat ions of the Auxi1iary Dam.

CP&L'ad the opt ions of removing this materia 1 or verifying that it met the acceptance criteria of the" revised Ebasco Specification CAR-SH-CH-4.

CP&L'ecided to remove previous ly placed materia 1 in the Auxi1iary Dam and Separating Dike and is presently construc-ting both structures in accordance with'he

.revised speci fication as approved by your staff.

Caro 1ina Power

& Light Company be 1ieves this resolves al1 of your staff' concerns regarding the" conformance of fi11 placed prior to'he'evision to Ebasco Specif ication CAR-SH-,CH-4..

Yours very truly, M. A. McDuffie Senior Vice President Engineei kg Construction MAM/jcb cc:

Mr. James P. 0'ei 1ly, Director Region II United States Nuclear Regulatory Commission 101 Marietta'treet',

N.W.

Atlanta, Georgia 30303'1 1 Fayetteville Street o P. O. Box 1551

~ Raleigh, N. C. 27602

(

eeeyu30 g7

PI