Text
REGUlATORY ORMATION DISTRI ACCESSION NBR t 8001030592 DOC ~ DATE: 79/12/2 PAt'It.:80 400 Shearori Bar ri s Nuclear Power Pl 50 Ilol Shearon FIarr'is Nuclear F'ower f l 50"402 Shearon Harris Nuc'Iear Power Pl AUTH'AME AUTHOR AFFILIAT'ION MCDOFFXKiM,A.
Caroline Power C Light Co.
RECIP;~AME AECII IKNi AFFILlAT/ON DENTUAiH,R, Offfce of NucTear Aeactor R
SUTION SY (RIOS) 6 NOTARIZED:
NO anti"Onion'i Carolina anti On'it 2i Caro'I'inc anti Onit 3i Carolina eguletion DOCKET 05QOI}400 o5oooltoi 05000Ej02
+dB SUBJECT Discusses placing of fill metis for main damieuxi separating dike. Impervious coI'e matl i emoved from de'm L separating"dike prior to Apri'I 1979,oam L d constructed per
'uxilfaiy ike be'ing OISTRIBUTION COOE:
COO2S COPIES RECEIVEO:LTR Q ENCL M TI L:
riv ionomments, NOTES:
SIZEe
/
WWWW~W
,, ACTION!
INTERNAL:
KG 07 5E'.
10 CST BNFT ANL>>
i2 GEOSCYEA BR" i4 At:bEAY ANALLY 16 RAO ASM'BR" AO KAVIAON TKCH OKLD 1
i ii 1
RECIPIENT COPIES I 5 GODK'/MAMK L>>T TR KN 05 PA S. KEBI uSEC 18 LA EP8 w~
1 RKCIPIENT IO COOK/NAME.
1/
Bc. ~PS'-'m Ao 'gloo gE.
02 NRC POR 09 EARN 8I KC BR 1i T'A/KOO i3 HYORO-METEOR i5 EFLT TRT SYS 19 O'ER
i EXTERNAL: 03 LPDR 20 NATL LAB 1
1 5
5 04 NSIC ACRS Lh-L4ug c.sd 4 wD 8'C min/ Z~
6 TOTAL NUMBER OF COPIES REQUIRED!
LTTR 28 ENCL
N 1
I W
,l l
Carolina Power 8 Light Company December 26,,
1979='r.
Harold R. Denton, Director Office of Nuclear Reactor Regulat ion United'tates 'uclear Regulatory Commiss ion Washington, D. C. '0555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2,, 3 AND 4 DOCKET NOS ~ 50-400, 50-401, 50-402,, AND 50-403'UXILIARY DAM AND SEPARATING DIKE
Dear Mr. Denton:
In Apri1, 1979, members of your staff expressed concern for the moisture content allowed by Ebasco Speci fication CAR-SH-CH-4 "Embankments, Dams, Dikes, and Channels" in placing fi11 mater ials for the Main Dam, Auxi1iary Dam, and Separat ing Dike.
As a result of conversat ions between your s taff and Caro 1ina Power
& Light Company (CP&L) pers one 11, Ebasco Speci fication CAR-SH-CH-4 was revised.
However, prior to the Apri1, 19 7 9 conversat ions, some impervious core material had been placed at the Auxiliary Separating Dike and at two 1ocat ions of the Auxi1iary Dam.
CP&L'ad the opt ions of removing this materia 1 or verifying that it met the acceptance criteria of the" revised Ebasco Specification CAR-SH-CH-4.
CP&L'ecided to remove previous ly placed materia 1 in the Auxi1iary Dam and Separating Dike and is presently construc-ting both structures in accordance with'he
.revised speci fication as approved by your staff.
Caro 1ina Power
& Light Company be 1ieves this resolves al1 of your staff' concerns regarding the" conformance of fi11 placed prior to'he'evision to Ebasco Specif ication CAR-SH-,CH-4..
Yours very truly, M. A. McDuffie Senior Vice President Engineei kg Construction MAM/jcb cc:
Mr. James P. 0'ei 1ly, Director Region II United States Nuclear Regulatory Commission 101 Marietta'treet',
N.W.
Atlanta, Georgia 30303'1 1 Fayetteville Street o P. O. Box 1551
~ Raleigh, N. C. 27602
(
eeeyu30 g7