Notifies That FSAR Will List Electrical Equipment,Equipment Location,Seismic & Environ Envelope & Qualification Methods & Results.Not All Test Data Available at Filing Time.Testing Program Will Be Completed in Late 1981 or Early 1982
ML18003A661
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 09/17/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 7909210353
Download: ML18003A661 (4)


Text

REGULATORY ORMATION DISTRIBUTION SY (BIDS)

ACCESSION NBR+7909210353 DOC,DATE: 79/09/17 NOTARlZED:

NO FACIL:50-000 Shearon Harris Nuclear Power Plant< Unit ii Carolina 50<<401 Shearon Harris Nuc)ear Power Planti Unit 2i Carolina 50-402 Shearon Harris Nuclear Power Planti Unit 3i Carolfna AUTHNAME AUTHOR AFFILIATION MCDUFFIE<M,A.

Carolina Power 8 Light Co.

RECIP ~ NAME RECIPIEN f AFFILIATION DENTONiH ~ RE Office of Nuclear Reactor Regulation DOCKET ¹ 05000400 050O0401 05000402

SUBJECT:

Describes FSAR,FSAR will list electr ical equipmentiequfpment location sqfsmic 4 environ envelope 8 qualification method 8

results.Not all test data available at FSAR ff)fng time.

Testing program will be completed late 1981 or early 1982.

DISTR ISUTION CODE:

R" 0 IS COPIES RECEIVED:LTR g'NCI.

g SIZE: /

TITLEi PSAA/FSAR Amdts ~

8 Related Correspondence N

PC ~

OTESS 0

~

RECIPIENT COPIES Io coDE/NAME LTTR ENc ACTION!

05 PM /ni+E4 1

Bc Lcug oft 1

iNTERNAL!

06 09 GEOSCIEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I 8

C SYS BH 22 AD SITE TECH 27 EFFL TRT SYS 29 KIRK'(OOD AO PLANT SYS AO SITE ANLYSIS HYDRO METEOR BA OELD REC IP IENT COPIES L

ID CODE/NAME LTTH EN L

AD C. Li/g 1

LA Cccl+~ 9' 02 NRC POR 08 OPERA LIC UR 10 QAB 12 STRUC ENG UR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN*SYs 21 POl'>EH SYS

&R 26 ACCONT ANLYS 28 RAD ASMT BN AD FOR ENG AO REAC SAFETY DIRECTOR NRH MPA EXTERNAL: 03 LPDR 30 ACRS 1

10 1

04 NSIC

~<~a4 ~sZ S5' TOTAL NUMBER OF COPIES REQUIRED; LTTR ~

ENCL

t 0

~

I 1

t k

, '1 c

H J I II f (

g 11 S,

II

<1 I

C p

v II g] 4P+

u

Carolina Power & Light Company September 17, 1979 Mr. Harold R. Denton nrp Director, Office of Nuclear Reactor Regulation

/ger~

United States Nuclear Regulatory Commission Washington, D.

C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS.

1, 2, 3 AND 4 DOCKET NOS. 50-400, 50-401, 50-402 AND 50-403 ENVIRONMENTAL QUALIFICATION OF CLASS 1E ELECTRICAL EQUIPMENT

Dear Mr. Denton:

Carolina Power

& Light Company (CP&L) recognizes the importance of environmental qualification of Class lE electrical equipment and the high priority placed on it by your staff, and has undertaken to provide a comprehensive and thorough environmental qualification program for the Shearon Harris Nuclear Power Plant.

This program will be described in detail in the facility Final Safety Analysis Report (FSAR), which is scheduled to be filed in June of 1980.

However, in view of the importance of this issue, we believe it would be beneficial to briefly describe the FSAR material at this time.

The description in the FSAR willlist individual pieces of equipment, their location, the seismic and environmental envelope that it is or will be qualified to, the qualification method and the qualification results.

It should be noted, however, that at the time of the filing of the FSAR, not all of the test data for all of the equipment will be available.

The testing program for the equipment involved is ongoing and is anticipated to be completed in late 1981 and early 1982.

All required test data will be available and on file prior to receiving the Operating License for the facility. It is not CP&L's intention to provide the test data in the

FSAR, but rather to specify the qualification envelope, method of qualification and qualification results.

Test data for individual pieces of equipment will be located in CP&L files and available for atfdit.

We believe that this is a reasonable approach and consistent with other.recently docketed

FSARs, such as, Commanche
Peak, South Texas and Waterford.

The above program is based on receiving an Operating License in June of 1983.

It is our understanding that th&NRC staff considers the inclusion in the FSAR of information pertaining to environmental qualification to be an important aspect of the FSAR.

Since it is our commitment to submit all necessary information in the FSAR, we would appreciate your informing us by October 1,

1979 if you will require any additional information.

Yours very truly, JJS-pb cc:

Mr. R. J. Mattson (NRC)

Mr. D. J. Eisenhut (NRC)

Mr. J.

P. O'Reilly (NRC)

M. A. McDuff e Senior Vice President Engineering