Forwards IE Insp Repts 50-400/79-14,50-401/79-14, 50-402/79-13 & 50-403/79-13 on 790723-26.No Noncompliance Noted
ML18003A659
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/13/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18003A658 List:
References
NUDOCS 7909210173
Download: ML18003A659 (4)


See also: IR 05000400/1979014

Text

~p,8 REGS

P0

Cy

-> +c

w)

g

0

n 4 y**+

In Reply Refer To:

RII:RDB

50-400/79-14

50-401/79-14

50-402/79-13

50-403/79-13

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,G EORG IA30303

AUG 1 3 1979

Carolina Power and Light Company

Attn:

J

~ A. Jones,

Executive Vice President

and Chief Operating Officer

411 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

This refers to the inspection

conducted

by R. D. Bradley of this office

on July 23-26,

1979 of activities authorized

by NRC Construction Permit

Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Shearon Harris

Nuclear Power Plant facility, Units 1, 2,

3 and 4, and to the discussion

of our findings held with R.

M. Parsons

at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

We have examined actions you have taken with regard to a previously

reported unresolved

item.

The status

of this i.tern is discussed

in the

enclosed report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

~ f

,I

.

Carolina Power

and

Light Company

AUG 13

1S79

such information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

C. E. Murphy, Chief

Reactor Construction

and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-400/79-14,

50-401/79-14,

50-402/79-13

and

50-403/79-13

cc w/enclosures:

R. Parsons,

Site Manager

Post Office Box 101

New Hill, North Carolina

27562

~

4

-