ML18003A644

From kanterella
Jump to navigation Jump to search
Confirms Util Commitments Made in 790817 Telecon Re Rockfill Matl to Be Used in Main Dam,Leading to NRC Approval of Facility Main Dam in-place Test Fill Program
ML18003A644
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/28/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 7909040548
Download: ML18003A644 (6)


Text

REGULATOR NFORMATION DISTRIBUTION.

TEM (BIDS) 1979 ACCESSION NBR:7909040548 DOC ~ DATE; 79/08/28 NOTARIZED; NO FACIL:50-400 Shearon Harris Nuclear Power Plant~ Unit 1g Carolina 50-401 Shear on Hart is Nuclear Power Plant~ Unit 2i Carolina 50 402 Shearon Harris Nuclear Power PlantP Unit 3i Carolina AUTH,NAME AUTHOR AFFILIATION MCDUFFIE~M,A.

Carolina Power L Light Co ~

RECIP ~ NAME RECIP IEN'l'FFILIATION DENTONPH ~ RE Office of Nuclear Reactor Regulation DOCKET 05000400 05000401 05000402

SUBJECT:

Confirms uti 1

commi tments made in 790817 tel econ re rockfi1 1

matl to be used in main dam leading to NRC approval of facilities main dam in-place test fill program, DISTRIBUTION CODE; BOO IB COPIES RECEIVED:LTR 2 ENCC EI SIZE:

TITLE: PSAA/FSAR Amdts ~

8 Related Correspondence

'e <<sew<<<<ww<<<<<<>>ww<<wwww<<W<<<<w'<<wwww<<<<<<w>>ww<<eeeW<<www<<W<<w<<W<<<<>>w<<w<<>>wwweeww>><<<<<<w<<>>tee t

~

I ACT'ION:

RECIPIENT ID CODE/NAME 05 PM mrPE'4 BC aV'~

COPIES LTTR EN 1

1 RECIPIENT COPIES L.

ID CODE/NAME LTTR ENCL AD LM4 1

LA L4dE WD 1

INTERNAL 01 REG F

9 GEOSCIEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I 8

C SYS BR 22 AD SITE TECH 27 EFFL TRT SYS 29 KIRKNOOD

,AD PLANT SYS AD SITE ANLYSIS HYDRO METEOR BR OELD 2

1

?

1 1

1 1

1 1

1 1

2 0?.

NRC PDR 08 OPERA LJC UR 10 GAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERP BR 19 CONTAIN SYS 21 POWER SYS BR 26 ACCDNT ANLYS 28 RAD ASMT BH AD FOR ENG AD REAC SAFETY DIRECTOR NRR MPA 1

1 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL 03 LPDR 30 ACRS 1

10 1

04 NSIC

/goo R E.

E/ a e w 8'C

<Ed/ u.s Eg M~ LA TOTAL NUMBER OF COPIES REQUIRED:

LTTR 51 ENCL G'

f I

~ ~l Wl I

C%QE Carolina Power & Light Company e

August 28, 1979 Mr. Harold R. Denton Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS. 1, 2, 3 AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 MAIN DAM IN-PLACE TEST"FILL PROGRAM g Ptll ljrgatr n, Deer Mr Denrnn:

~V"J'~tUi~j t,,"gi/~J I"gI Irg~~

On July 18, 1979, Carolina Power

& Light Company (CP&L) submitted the results of the Shearon Harris Nuclear Power Plant's (SHNPP) Main Dam In-Place Test Fill Program for your staff's review and approval.

Members of your staff, NRC Region II, and Corps of Engineers visited the SHNPP site on August 13, 1979,

'to view the main dam test fills. After additional discussions with members of the NRC and Corps of Engineers, CP&L made the following commitments concerning rockfill material to be used in the main dam by telephone conference call on August 17, 1979:

1.

The maximum size of any particle is limited to:

a)

The intermediate particle dimension (height, width or length) shall not exceed 90% of the lift thickness (i.e.,'

22 inches).

b)

The ratio of maximum to minimum particle dimension shall be no greater than 3 to 1.

c)

The gradation shall be no finer than that indicated on the D50 = 3" curve in figure 12 of the Main Dam Test Fill Report.

2.

On the downstream side of the main dam, between Stations 4+42 and 8+02, in the first three lifts:

a)

Fines shall not exceed a

5% limit passing a 200 sieve.

b)

Three field permability tests shall be performed with a minimum acceptable criteria of 10 3.

Three Atterburg limit tests shall be taken to determine the plastic index of the rockfill fines.

Results of these tests shall be submitted to the NRC upon completion.

411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602 s s 0 90 40+F8'

Mr. Harold R.. Denton 4.

Permability tests shall be taken at the same frequency as gradation and density tests (i.e. first two every 20,000 cubic yards, then every 40,000 cubic yards).

Acceptance criteria is 10 3.

5.

Two extra triaxial tests shall be conducted during the main dam construction.

Results of these tests will be documented in the FSAR.

As a result of the above commitments, your staff found the SHNPP Main Dam In-Place Test Fill Program acceptable and authorized construction of the main dam to proceed.

Yours very truly,

@eh.

M. A. McDuffie Senior Vice President Engineering 6 Construction MAM/jcb cc: