ML18003A591
| ML18003A591 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/05/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| References | |
| NUDOCS 7906190348 | |
| Download: ML18003A591 (1) | |
Text
/AHA~fFils-I~
a TELEPKONE ltEPORT PACQ.~a..Shearon Harris 1
~ ~
DOCXZT 1s 6(5(79
SV3JECT:
Potential CDR
<<5 L ZION OP,~~U +<.
CP6L was informed y
b Vendor. Tube Turns, that of 18 g
pipe penetrations 5'elivered, 15 had collars which had not een treated after welding.
The 3 which had been heat tree e
~htok or greater.
The others were less than 1-< inch.
Penetrations were for i e sf,zes including 16-'18 inches.
Eleven penetrations not yet installed will ba returned to Tube Turns'immediately.
Pour wh c have been insta'lied will be cut out and returned.
t'~'
Tube Turns called RII.
They believe this is an isolate case are searching records to verify.
Tube Turns may su ao.
report.
Written report under 50e55 e
ue u
~ s Sic ~H~
I
~
I4'
~ ~
~ ~
~ a
~ ~
~ ~
~ a go~~0 /
s /
~ oooo oozing