,'aa REGULATORY lNFORMATION DISTRIBUTION S STEM (RIDS)
ACCESSION NBR!7906150319 DOC ~ OATES 79/06/11 NOTAR ZEO:
NO FACIL:50 400 Shearon Harris Nuclear Power Planti Unit ir Carolina 50"401 Shearon Harris Nuclear Power Plenty Unit 2'g Carolina 50"402 Shearon Harris Nuclear Power Plant> Unit 3i Carolina AUTH,NAME AUTHOR AFFILIATION MCDUFFIEEM,A, Carolina Power 8 Light Co, RECIP,NAME RECIPIENT AFFILIATION DENTONEH.R, Office of Nuclear Reactor Regulation
SUBJECT:
Notification that portions of main 8 auxiliary damcove trenches are ready for insp per Appendix A to 10CFR100
~
DISTRIBUTION CODE:
BOO IB COPIES RECEIYEDlLTR 1,
ENCL g SIZE:
TITLE: PSAA/FSAR AMDTS AND RELATED'CORRE8PONDENCE ~
DOCKET 0
050 QQ~
05000401 05000402
$03 cS
~
h tI I
&es Pe m e+ww~ wt'ai w++ 1>+ eT Pf 0+ <+~wfO~&mte wm w&w~ Pl qe ye I%im eo ss W~w 00 elwP0 Iil++IP 00 0> I+I9+IolSI'0 Ww'P0 t+ t~% 8+ t%PtliW~ 0+elf+
~
I
~
i 1
~
1 0
C i
~
h
~
a 4
~ j I I
~
~
I RECIPIENT COPIES ID CODE/NAME CTTR EN ACTION:
05 PM 5(g~
1 BC'w~
1 RECIPIENT COPIES L
1 LA Qg 1
L" INTERNAL:
06 I 8
E 09 GEOSCIEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I 8;
C SVS eg 22 AO SITE TECH 27 EFFL TRT SYS 29 KIRKNOOD AO PLANT SYS AO SITE ANLYSI8 MPA 02 NRC PDR 08 OPERA LIC BR 10 GAB 12 STRUC ENG BR 15 REAC SYS BH 17 CORE PERP BR 19 CONTAIN SYS 21 PONER SYS HR 26 ACCONT ANLYS 28 RAD ASMT BR AD FOR ENG AO REAC SAFETY DIRECTOR NRR OELD EXTERNAL: 03 LPDR 30 ACRS 1
10 1
00 NSIC JUN y 8 ]g7g I-aIS-gggr gag ga8LO~
Cl'8 A~~
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 09 FNCL 39
C
'1
'l
h JF Carolina Power 8 Light Company Mr. Harold R. Denton, Director June 11, 1979 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2,, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 RELEASE OF GEOLOGIC FEATURES AT THE MAIN AND AUXILIARYDAM
Dear Mr. Denton:
Carolina Power tx Light Company has been informing your staff when portions of the main and auxiliary dam core trenches have been cleaned and mapped in preparation for inspection by the NRC.
Subsequent to the concurrence by the NRC that these areas contain no faults t:hat could be described as capable, as defined in Appendix A to 10CFR100, your staff has given us verbal approval to cover geologic features in these areas.
Station coordinates'or the'ain dam are from 0+00 to 15+48.
Auxiliary dam Station coordinates are from -1+60 to 39+00.
As requested by your staff, we have prepared this response that (1) summarizes those areas verbally released by your staff, (2) identifies those areas that have, to date, been cleaned and mapped and are ready for inspection by your staff, and (3) identifies when the remaining areas of the main dam and auxiliary dam core trenches will be cleaned and mapped.
l.
Areas Verball Released b
the NRC I
a.
Main Dam Area Released
,Date West Conduit Wall (including the area at Station 2+50)
December 12, 1978 Downstream Side Between Stations 2+90 and 3+90 December 12, 1978 Upstream Side Between Stations 2+90 and 3+90 April 24, 1979 Area Between Stations 9+00 and 10+00 May 29, 1979 Area Between Stations 10+00 and 12+50, and Stations 1+90 and 2+90 June 5, 1979 b.
Auxiliary Dam Diversion Structure Between Stations 30+25 and 32+00 January 3,'979 February 23," 1979 Area Between Stations 18+90 and 39+00 411 Fayetteville Street o P. O.
x 1551 o Raleigh, N. C. 27602 gaol
@S~ I /
V806150+tp;j
II
June ll, 1979 Area Between Stations 14+05 and 18+90 June 5, 1979 2.
Areas Cleaned and Ma ed a.
Main Dam (1)
Core Trench Scale:
1" =
10'tations 1+90 to 5+50 Stations 9+00 to 12+50 b.
Auxiliary Dam (1)
Core Trench - Scale:
1" =
10'tations
-1+60 to 4+90 Stations 13+15 to 18+85 Stations 18+85 to 39+00 (2)
Under Core Outside of Trench Scale:
1" =
50'tations 21+50 to 25+00 Stations 29+00 to 32+60 (3)
Under Filters and Random Rockfill Scale:
1" 50'ownstream Side Between Stations 18+50 and 28+00 3.'stimated Schedule for Com letion of Cleanin and Ma in a.
Main Dam Week of July 2, 1979 b.
Auxiliary Dam Week of June 11, 1979 Xt is requested that you provide the required inspections by your staff at the approximate dates identified in item 3 above.
Carolina Power 6 Light Company will advise your staff of any revisions to these estimated dates.
Yours very truly, MAM/tl cc:
Mr. James
'P. O'Reilly M. A. McDuffie Senior Vice President Engineering 6 Construction